My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2020 (3)
CBCC
>
Meetings
>
2020's
>
2020
>
05/19/2020 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:27 PM
Creation date
8/19/2020 1:06:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seed & Mulch (Seed Purchased By Owner) - Add the purchase of <br />73A ' Bahiagrass/Millet blend seed and add hydroseeding to stabilize pond $6,894.34 LS 1 $6,894.34 <br />ba n ks. <br />New Item Additional bond cost associated with C0#1 net increase. $293.43 LS 1 $293.43 <br />Change Order 001 Subtotal $36,971.90 <br />Change Order 2 <br />New <br />#80 <br />FPL Directional Bore 2" (service line to pavilion) <br />$30.80 <br />LF <br />205 <br />$6,314.00 <br />#81 <br />FPL Directional Bore 2" (installation only - FPL to provide material) <br />$27.50 <br />LF <br />220 <br />$6,050.00 <br />#82 <br />AT&T Directional Bore 2" (primary) <br />$30.80 <br />LF <br />220 <br />$6,776:00 <br />#83 <br />AT&T Directional Bore 1.5" (service to house) <br />$30.80 <br />LF <br />135 <br />$4,158.00 <br />#84 <br />COMCAST Directional Bore 2" (service to house) <br />$30.80 <br />LF <br />135 <br />$4,158.00 <br />#85 <br />Site Electric Directional Bore 1.25" (pavilion to garage / pavilion to <br />house) <br />$28.60 <br />LF <br />135 <br />$3,861.00 <br />#86 <br />Site Electric Directional Bore 1" (house to start of dock) <br />$28.60 <br />LF <br />145 <br />$4,147.00 <br />#87 <br />Site Electric Directional Bore 2" (screw pump to pavilion) <br />$30.80 <br />LF <br />290 <br />$8,932.00 <br />#88 <br />Site Electric - Electrician pulling CU conductors between FPL <br />hand hole to pavilion, pavilion to south building and pavilion to staff house <br />$15,262.50 <br />LS <br />1 <br />$15,262.50 <br />#89 <br />Additional bond cost associated with CO#2 increase <br />$477.27 <br />LS <br />1 <br />$477.27 <br />Change Order 002 Subtotal <br />$60,135.77 <br />10% Contingency $42,287.50 <br />The total Contract cost has increased $139,395.17 from $1,393,951.68 to <br />$1,533,346.85 as a result of Change Order No. 1, Change Order 2 and the additional contingency difference <br />added. <br />99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.