My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2020 (3)
CBCC
>
Meetings
>
2020's
>
2020
>
05/19/2020 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:27 PM
Creation date
8/19/2020 1:06:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: May 7, 2020 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: John M. Boyer, P.E., Utilities Engineer <br />Subject: Developer's Agreement for the installation of Off -Site Sewer Mains to Vero Beach Medical <br />Office Building <br />Description and Conditions: <br />The proposed Vero Beach Medical Office Building will be located at 3955 Indian River Boulevard and will <br />connect to the county sewer system located at the northeast corner of Indian River Boulevard and 411t <br />Street. Indian River County Department of Utility Services (IRCDUS) has requested that the developer, <br />Vero Beach Medical Office Building, LLC (Developer), upsize the proposed sanitary sewer force main from <br />4 -inches diameter to 6 -inches diameter to allow connections from future development along Indian River <br />Boulevard. <br />Attachment 1 is a proposed Developer's Agreement with the Developer for reimbursement of a portion of <br />the subject sanitary sewer force main. The Developer's Agreement is stipulated to reimburse the Developer <br />for the county's share of the cost of up-sizing the force main upon its completion, acceptance by the county, <br />and dedication to the county. The reimbursement is detailed in Section 1 of the Developer's Agreement. <br />Analysis: <br />The installation of the sanitary sewer force main will benefit the proposed development and future growth <br />along Indian River. Boulevard. The 6 -inch diameter force main will run along the east side of Indian River <br />Boulevard from the intersection of Indian River Boulevard and 4152 Street south to the north limits of the <br />proposed development, a distance of approximately 785 linear feet, as illustrated in Exhibit B of the <br />attached agreement. As shown on Exhibit C of the attached agreement, the estimated offsite force main cost <br />sharing between the Developer and IRCDUS is as follows: <br />Developer's Share $ 27,354.59 . <br />County's Share $ 6,416.51 <br />Total Project Cost $33,771.10 <br />The costs were determined based on a hydraulic fair share (81% Developer's share; 19% county's share) of <br />the off-site construction costs. <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.