My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2020 (3)
CBCC
>
Meetings
>
2020's
>
2020
>
05/19/2020 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:27 PM
Creation date
8/19/2020 1:06:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
52 <br />Exhibit C - Estimate of Construction Cost <br />Vero Beach MOB Offsite Forcemain <br />Bid Item <br />No. <br />.Bid Item Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit Price <br />Total Price <br />6" Forcemain <br />1 <br />6" PVC Forcemain (DR18) <br />475 If <br />$30.00 <br />$14,250.00 <br />2 <br />6" HDD (inc HDPE, Fusing, & Bentonite Removal) <br />310 If <br />$31.50 <br />$9,765.00 <br />3 <br />6" MJ Adaptor <br />2 ea <br />$600.00 <br />$1,200.00 <br />4 <br />6" Gate Valve w/ Cap & Restraints <br />1 ea <br />$2,000.00 <br />$2,000.00 <br />5 <br />4" HDD (inc HDPE, Fusing, & Bentonite Removal) <br />150 If <br />$25.50 <br />$3,825.00 <br />6 <br />4" MJ Adaptor <br />2 ea <br />$500.00 <br />$1,000.00 <br />7 <br />4" Gate Valve <br />1 ea <br />$1,156.10 <br />$1,156.10 <br />8 <br />HDD Contractor Mobilization <br />1 ea <br />$575.00 <br />$575.00 <br />Total Construction Cost: <br />$33,771.10 <br />IRCDUIS Share (19%): <br />$6,416.51 <br />Developer's Share (81%): <br />$27,354.59 <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.