Laserfiche WebLink
52 <br />Exhibit C - Estimate of Construction Cost <br />Vero Beach MOB Offsite Forcemain <br />Bid Item <br />No. <br />.Bid Item Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit Price <br />Total Price <br />6" Forcemain <br />1 <br />6" PVC Forcemain (DR18) <br />475 If <br />$30.00 <br />$14,250.00 <br />2 <br />6" HDD (inc HDPE, Fusing, & Bentonite Removal) <br />310 If <br />$31.50 <br />$9,765.00 <br />3 <br />6" MJ Adaptor <br />2 ea <br />$600.00 <br />$1,200.00 <br />4 <br />6" Gate Valve w/ Cap & Restraints <br />1 ea <br />$2,000.00 <br />$2,000.00 <br />5 <br />4" HDD (inc HDPE, Fusing, & Bentonite Removal) <br />150 If <br />$25.50 <br />$3,825.00 <br />6 <br />4" MJ Adaptor <br />2 ea <br />$500.00 <br />$1,000.00 <br />7 <br />4" Gate Valve <br />1 ea <br />$1,156.10 <br />$1,156.10 <br />8 <br />HDD Contractor Mobilization <br />1 ea <br />$575.00 <br />$575.00 <br />Total Construction Cost: <br />$33,771.10 <br />IRCDUIS Share (19%): <br />$6,416.51 <br />Developer's Share (81%): <br />$27,354.59 <br />52 <br />