My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/21/2020 (5)
CBCC
>
Meetings
>
2020's
>
2020
>
04/21/2020 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2020 11:35:21 AM
Creation date
8/20/2020 11:30:55 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/21/2020
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverable: Certification of Completion including documentation of submittal affirming that the final <br />design document was completed and submitted to the Department. For interim payment requests, a Task <br />Summary Report signed by the Local Sponsor must be submitted detailing work progress during the <br />payment request period. The Task Summary Report must include the dates and descriptions of all activities, <br />surveys and reports completed or in progress during the time period of the interim payment request. <br />Performance Standard: The DEP Project Manager will review the task deliverable and any associated <br />work products as necessary to verify they meet the specifications in the Grant Work Plan and this task <br />description. <br />Payment Request Schedule: Payment requests may be submitted after the deliverable is received and <br />accepted and may be submitted no more frequently than quarterly. <br />Task 3 Construction <br />Task Description: This task includes work performed and costs incurred associated with the placement of <br />fill material and/or the construction of erosion control structures within the Project area. Project costs <br />associated with eligible beach and inlet construction activities include work approved through construction <br />bids and/or construction -phase engineering and monitoring services contracts. Eligible costs may include <br />mobilization, demobilization, construction observation or inspection services, physical and environmental <br />surveys, beach fill, tilling and scarp removal, erosion control structures, mitigation reefs, dune stabilization <br />measures and native beach -dune vegetation. Construction shall be conducted in accordance with any and <br />all State or Federal permits. The Local Sponsor will submit work products to the appropriate State or Federal <br />regulatory agencies as requested by the DEP Project Manager in order to be eligible for reimbursement <br />under this task. <br />Deliverable: Certification of Completion by a Florida -registered Professional Engineer with <br />documentation of submittal to the Department affirming the construction task was completed in accordance <br />with construction contract documents. For interim payment requests, a Task Summary Report must be <br />submitted detailing activities completed during the payment request period. The Task Summary Report <br />must include the dates and descriptions of all activities, surveys and reports completed or in progress during <br />the time period of the interim payment request. <br />Performance Standard: The DEP Project Manager will review the task deliverableand any associated <br />work products as necessary to verify they meet the specifications in the Grant Work Plan and this task <br />description. <br />Payment Request Schedule: Payment requests may be submitted after the deliverable is received and <br />accepted and may be submitted no more frequently than quarterly. <br />68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.