Laserfiche WebLink
IRC -1909 <br />21.02 OWNER shall return one fully signed counterpart to Successful Bidder. <br />21.03 Should Bidder to whom the Contract has been awarded refuse or fail to complete the <br />requirements of Article 21.01 above, the additional time in calendar days, required to correctly <br />complete the documents will be deducted, in equal amount, from the Contract time. Or, the <br />OWNER may elect to revoke the Award and the OWNER shall hold the Bid Bond for <br />consequential damages incurred, and the Contract may be awarded as the OWNER desires. <br />* * END OF SECTION * * <br />Instructions to Bidders - 00200 - 11 <br />I'APublic Works\ENGINEERING DIVISION PROJECTS\1909 8th ST at IRB Signalization Improv\1-Admin\Bids\Bid Documents\DIV 0_1_13idding Documents.docx <br />