Laserfiche WebLink
ITEMIZED BID SCHEDULE <br />PROJECT NAME: INDIAN RIVER BOULEVARD & 8TH STREET SIGNALIZATION IMPROVEMENTS <br />PROJECT NO. IRC -1909 BID NO. 2020037 FM NO. N/A <br />BIDDER'S NAME: SUNSHINE LAND DESIGN, INC <br />Item No.' <br />Description <br />'.Unit <br />Unit Price <br />Quantltv <br />Amount <br />ROADWAY PAY ITEMS <br />101-1 <br />MOBILIZATION/ DEMOBILIZATION <br />LS <br />66,044.00 <br />1 <br />$66,044.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />LS <br />33,715.13 <br />1 <br />$33,715.13 <br />104-2 <br />PREVENTION, CONTROL & ABATEMENT OF EROSION AND WATER <br />POLLUTION <br />LS <br />12,457.50 <br />1 <br />$12,457.50 <br />110-1-1 <br />CLEARING & GRUBBING <br />LS <br />27,500.00 <br />1 <br />$27,500.00 <br />120-4 ISUBSOIL <br />EXCAVATION <br />CY <br />1 27'50 <br />135 <br />$3,712.50 <br />120-6 <br />EMBANKMENT <br />CY <br />34. 07 <br />250 <br />$8,517.50 <br />285-7-14 <br />CEMENTED COQUINA LBR 100 15" <br />SY <br />45.43 <br />24 <br />$1,090.32 <br />327-70-6 <br />ASPHALT PAVEMENT MILLING (1.5-1 <br />SY <br />1 6.60 <br />3,525 <br />$23,265.00 <br />337-7-83A <br />ASPHALT CONCRETE FRICTION COURSE (FC -12.5) (TR -C) (PG 76-22) <br />1.5' <br />TN <br />207.30 <br />307 <br />$63,641.10 <br />337-7-83B <br />ASPHALT CONCRETE STRUCTURAL COURSE SP -12.5) (TR -C) (1.5" <br />TN <br />681.45 <br />2 <br />1,362.90 <br />425-1-543 <br />DBI INLET PED(J-BOTTOM) < 10' <br />EA <br />9870.30 <br />1 <br />$ 9,870.30 <br />425-2-41 <br />MANHOLE P-7 < 10' <br />EA <br />7550.73 <br />1 <br />$ 7,550.73 <br />425-2-61 <br />MANHOLE P-8 < 10' <br />EA <br />6250.37 <br />1 <br />$6,250.37 <br />425-2-71 <br />MANHOLE J-7 < 10' <br />EA <br />8335.64 <br />1 <br />$8,335.64 <br />425-5 <br />MANHOLE(ADJUST) <br />EA <br />880.00 <br />1 <br />880.00 <br />425-6 <br />VALVE BOX (ADJUST)440.00 <br />EA <br />1 <br />$440.00 <br />430-175-112 <br />CONCRETE PIPE CULVERT 12"(S/CD) <br />LF <br />84.28 <br />16 <br />$1,348.48 <br />430-175-115 <br />CONCRETE PIPE CULVERT 15"(S/CD) <br />LF <br />84.29 <br />26 <br />$2,191.54 <br />430-175-124 <br />CONCRETE PIPE CULVERT 24"(S/CD) <br />LF <br />96.00 <br />148 <br />$14,208.00 <br />430-175-130 <br />CONCRETE PIPE CULVERT 30"(S/CD) <br />LF <br />124'22 <br />38 <br />$4,720.36 <br />430-175-218 <br />CONCRETE PIPE CULVERT 14"X23"(S/CD) <br />LF <br />162.72 <br />24 <br />$3,905.28 <br />430-984-125 <br />MITERED END SECTION SD 18' <br />EA <br />791.45 <br />1 <br />$791.45 <br />430-984-129 <br />MITERED END SECTION SD 24' <br />EA <br />963.60 <br />2 <br />$1,927.20 <br />522-2 <br />CONCRETE SIDEWALK, FIBER REINFORCED 3000 PSI 6" THICK <br />SY <br />59.40 <br />272 <br />$16,156.80 <br />527-2 <br />DETECTABLE WARNINGS <br />SF <br />49.50 <br />30 <br />$1,485.00 <br />570-1-2 <br />PERFORMANCE TURF SOD <br />Sy <br />6.60 <br />3,104 <br />$20,486.40 <br />700-1-11 <br />SINGLE POST SIGN F & I GM < 12 SF <br />AS <br />653.40 <br />1 <br />$653.40 <br />003103 <br />F.Tublic Works\ENGINEERING DIVISION PROJECTS\1909 8th ST at IRB Signalization Improv\1-Admin\Bids\Bid DocumentsWASTER ITEMIZED BID SCHEDULE <br />