My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-127B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-127B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 2:44:02 PM
Creation date
9/2/2020 10:39:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2020
Control Number
2020-127B
Agenda Item Number
8.E.
Entity Name
Sunshine Land Design, Inc.
Subject
Contract Documents and Specifications for Indian River Boulevard & 8th Street Signalization
Project Number
IRC-1909
Bid Number
2020037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEMIZED BID SCHEDULE <br />PROJECT NAME: INDIAN RIVER BOULEVARD & 8TH STREET SIGNALIZATION IMPROVEMENTS <br />PROJECT NO. IRC -1909 BID NO. 2020037 FM NO. NIA <br />BIDDER'S NAME: <br />Item No. <br />Description <br />Unit <br />Unit Price <br />Quantity <br />Amount <br />660-411 <br />VEHICLE DETECTION VIDEO (F&I) (CABINET EQUIPMENT) <br />EA <br />5126.00 <br />1 <br />$5,126.00 <br />$27,280.00 <br />660A-12 <br />VEHICLE DETECTION VIDEO (F&I) (ABOVE GROUND EQUIPMENT) <br />EA <br />6820.00 <br />4 <br />154.00 <br />$616.00 <br />665-1-11 <br />PEDESTRIAN DETECTOR F & I POLE/PEDESTAL MOUNTED <br />EA <br />4 <br />TRAFFIC CONTROLLER ASSEMBLY (F & 1) (NEMA) (TYPE 5) (ONE <br />$31,526.00 <br />670-5-111 <br />PREEMPTION PLAN) <br />AS <br />31526.00 <br />1 <br />TRAFFIC CONTROLLER ASSEMBLY (REMOVE) (CONTROLLER WITH <br />670-5-600 <br />CABINET) PLUS PAD <br />AS <br />517.00 <br />1 <br />$517.00 <br />ITS CCN CAMERA (F & 1) (DOME ENCLOSURE, PTZ) (NON -6039.00 <br />6039.00 <br />$ <br />682-1-133 <br />PRESSURIZED IP HD <br />EA <br />1 <br />$2838.00 <br />684-1-1 <br />MANAGED FIELD ETHERNET SWITCH F & I <br />EA <br />2838.00 <br />1 <br />WIRELESS COMMUNICATION DEVICE (FURNISH ONLY) (ETHERNET <br />2981.00 <br />$11,924.00 <br />684-6-11 <br />ACCESS POINT)EA <br />4 <br />UNINTERRUPTIBLE POWER SUPPLY (F & 1) (LINE INTERACTIVE WITH <br />$7326.00 <br />685-1-13 <br />CABINET) <br />EA <br />7326.00 <br />1 <br />700-5-22 <br />INTERNALLY ILLUMINATED STREET NAME SIGN <br />EA <br />2739.00 <br />6 <br />$16,434.00 <br />0. 44 <br />$2372.04 <br />715-1-11 <br />LIGHTING CONDUCTORS F & I INSULATED No. 10 OR < <br />LF <br />5,391 <br />1386.00 <br />$5,544.00 <br />715-5-31 <br />LUMINAIRE & BRACKET ARM F & I <br />EA <br />4 <br />999-1 <br />CONSTRUCTION LAYOUT/ RECORD DRAWINGS <br />LS <br />9900.00 <br />1 <br />$9,900.00 <br />INDIAN RIVER BOULEVARD & 8TH STREET SIGNALIZATION IMPROVEMENTS SUB TOTAL <br />$743,575.00 <br />999-25 <br />1 FORCE ACCOUNT <br />55,000.00 <br />TOTAL BID AMOUNT INCLUDING FORCE ACCOUNT TOTAL <br />798,575.00 <br />LS=Lump Sum EA=Each PI=Per Intersection AS=Assembly SF= Square Foot SY=Square Yard <br />GAL=Gallon LF=Linear Foot CY=Cubic Yard TN=TON <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) AND THE ITEMIZED BID SCHEDULE, <br />THE BID SCHEDULE WILL BE UTILIZED FOR BIDDING PURPOSES. <br />TOTAL PROJECT BID AMOUNT IN WORDS, <br />SEVEN HUNDRED NINETY EIGHT THOUSAND, FIVE HUNDRED SEVENTY FIVE DOLLARS <br />AND ZERO CENTS <br />003105 <br />I'APublic Works\ENGINEERING DIVISION PROJECTS\1909 8th ST at IRB Signafizalion Improv\t-Admin\8ids\Bid DocumentsUNASTER ITEMIZED BID SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.