My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-127B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-127B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 2:44:02 PM
Creation date
9/2/2020 10:39:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2020
Control Number
2020-127B
Agenda Item Number
8.E.
Entity Name
Sunshine Land Design, Inc.
Subject
Contract Documents and Specifications for Indian River Boulevard & 8th Street Signalization
Project Number
IRC-1909
Bid Number
2020037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />CONTRACT FOR: INDIAN RIVER BOULEVARD & 8TH STREET SIGNALIZATION <br />IMPROVEMENTS <br />Project No.: IRC -1909 <br />FM No.: N/A <br />Project Description: The proposed improvements to the intersection of Indian River Boulevard and <br />8th Street consist of the signalization of the intersection by installing mast arm <br />assemblies with traffic signals milling and resurfacing installation of <br />pedestrian crosswalks sidewalk ramps and landings associated signage and <br />pavement markings and sodding. <br />OWNER's Bid No. <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To: <br />OWNER <br />And To. <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR <br />to complete all the Work in accordance with the Contract Documents. The items in the tentative <br />list shall be completed or corrected by CONTRACTOR within 30 calendar days of the above date <br />of Substantial Completion. <br />Certificate of Substantial Completion REV 04-07 - 00630 - 1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1909 8th ST at IRB Signalization Improv\1-Admin\Bids\Bid Documents\DIV 0 3 Contract Forrns.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.