My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-127B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-127B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 2:44:02 PM
Creation date
9/2/2020 10:39:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2020
Control Number
2020-127B
Agenda Item Number
8.E.
Entity Name
Sunshine Land Design, Inc.
Subject
Contract Documents and Specifications for Indian River Boulevard & 8th Street Signalization
Project Number
IRC-1909
Bid Number
2020037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
characteristics; (ii) it will reliably perform at <br />license fee or royalty. All variations of the <br />least equally well the function imposed by <br />proposed substitute item from that specified <br />the design concept of the completed Project <br />will be identified in the application, and <br />as a functioning whole, and; <br />available engineering, sales, maintenance, <br />repair, and replacement services will be <br />b. CONTRACTOR certifies that: (i) there <br />indicated. The application will also contain <br />is no increase in cost to the OWNER; and (ii) <br />an itemized estimate of all costs or credits <br />it will conform substantially, even with <br />that will result directly or indirectly from use <br />deviations, to the detailed requirements of <br />of such substitute item, including costs of <br />the item named in the Contract Documents. <br />redesign and claims of other contractors <br />affected by any resulting change, all of which <br />2. Substitute Items <br />will be considered by ENGINEER in <br />evaluating the proposed substitute item. <br />a. If in ENGINEER's sole discretion an <br />ENGINEER may require CONTRACTOR to <br />item of material or equipment proposed by <br />furnish additional data about the proposed <br />CONTRACTOR does not qualify as an <br />substitute item. <br />"or-equal" item under paragraph 6.05.A.1, it <br />will be considered a proposed substitute <br />B. Substitute Construction Methods or Proce- <br />item. <br />dures: If a specific means, method, technique, se- <br />quence, or procedure of construction is shown or <br />b. CONTRACTOR shall submit suffi- <br />indicated in and expressly required by the Contract <br />cient information as provided below to allow <br />Documents, CONTRACTOR may furnish or utilize a <br />ENGINEER to determine that the item of <br />substitute means, method, technique, sequence, or <br />material or equipment proposed is <br />procedure of construction approved by ENGINEER. <br />essentially equivalent to that named and an <br />CONTRACTOR shall submit sufficient information to <br />acceptable substitute therefor. Requests for <br />allow ENGINEER, in ENGINEER's sole discretion, to <br />review of proposed substitute items of <br />determine that the substitute proposed is equivalent to <br />material or equipment will not be accepted <br />that expressly called for by the Contract Documents. <br />by ENGINEER from anyone other than <br />The procedure for review by ENGINEER will be similar <br />CONTRACTOR. <br />to that provided in subparagraph 6.05.A.2. <br />c. The procedure for review by ENGI- <br />C. Engineer's Evaluation: ENGINEER will be <br />NEER will be as set forth in paragraph <br />allowed a reasonable time within which to evaluate <br />6.05.A.2.d, as supplemented in the General <br />each proposal or submittal made pursuant to para- <br />Requirements and as ENGINEER may <br />graphs 6.05.A and 6.05.B. ENGINEER will be the sole <br />decide is appropriate under the <br />judge of acceptability. No "or-equal" or substitute will <br />circumstances. <br />be ordered, installed or utilized until ENGINEER's <br />review is complete, which will be evidenced by either a <br />d. CONTRACTOR shall first make <br />Change Order for a substitute or an approved Shop <br />written application to ENGINEER for review <br />Drawing for an "or equal." ENGINEER will advise <br />of a proposed substitute item of material or <br />CONTRACTOR in writing of any negative <br />equipment that CONTRACTOR seeks to <br />determination. <br />furnish or use. The application shall certify <br />that the proposed substitute item will perform <br />D. Special Guarantee: OWNER may require <br />adequately the functions and achieve the <br />CONTRACTOR to furnish at CONTRACTOR's ex- <br />results called for by the general design, be <br />pense a special performance guarantee or other surety <br />similar in substance to that specified, and be <br />with respect to any substitute. <br />suited to the same use as that specified. The <br />application will state the extent, if any, to <br />E. ENGINEER's Cost Reimbursement.- <br />eimbursement.which <br />whichthe use of the proposed substitute <br />ENGINEER will record time required by ENGINEER <br />item will prejudice CONTRACTOR's <br />and ENGINEER's Consultants in evaluating substitute <br />achievement of Substantial Completion on <br />proposed or submitted by CONTRACTOR pursuant to <br />time, whether or not use of the proposed <br />paragraphs 6.05.A.2 and 6.05.13 and in making <br />substitute item in the Work will require a <br />changes in the Contract Documents (or in the <br />change in any of the Contract Documents (or <br />provisions of any other direct contract with OWNER for <br />in the provisions of any other direct contract <br />work on the Project) occasioned thereby. Whether or <br />with OWNER for work on the Project) to <br />not ENGINEER approves a substitute item so pro- <br />adapt the design to the proposed substitute <br />posed or submitted by CONTRACTOR, CON- <br />item and whether or not incorporation or use <br />TRACTOR shall reimburse OWNER for the charges of <br />of the proposed substitute item in connection <br />ENGINEER and ENGINEER's Consultants for <br />with the Work is subject to payment of any <br />evaluating each such proposed substitute. <br />General Conditions - 00700 - 15 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1909 8th ST at IRB Signalization Improv\1-Admin\Bids\Bid Documents\DIV 0_4_Conditions of the Contract. docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.