My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-145A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-145A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 9:44:41 AM
Creation date
9/8/2020 4:14:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/18/2020
Control Number
2020-145A
Agenda Item Number
8.Q.
Entity Name
Lawrenece Lee Construction Services, Inc.
Subject
Hobart RO Water Treatment Plant Chemical Tank Replacements
Bid Number
2020044
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and <br />CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall <br />pay OWNER $566.00 for each calendar day that expires after the time specified in paragraph 3.02 <br />for completion and readiness for final payment until the Work is completed and ready for final <br />payment. <br />ARTICLE 4 - CONTRACT PRICE <br />4.01 OWNER shall pay CONTRACTOR for completion of the Work an amount in current funds equal to <br />the sum of the amounts determined pursuant to paragraph 4.01.A and summarized in paragraph <br />4.01.8, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, and shown below: <br />1. Mobilization, De -mobilization and Planning $20,000 <br />2. Bonds and Insurance <br />3. Demolition <br />$15,000 <br />$40,000 <br />4. Sulfuric Acid Tank Improvements $182,000 <br />5. Caustic Tank Improvements $132,000 <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract Documents: <br />Numerical Amount: $389,000.00 <br />Written Amount: Three hundred eighty-nine thousand dollars <br />ARTICLE 5 - PAYMENT PROCEDURES <br />5.01 Progress Payments. <br />A. The OWNER shall make progress payments to the CONTRACTOR on the basis of the <br />approved partial payment request as recommended by ENGINEER in accordance with the <br />provisions of the Local Government Prompt Payment Act, Florida Statutes section 218.70 et. <br />seq. The OWNER shall retain ten percent (10%) of the payment amounts due to the <br />CONTRACTOR until fifty percent (50%) completion of the work. After fifty percent (50%) <br />completion of the work is attained as certified to OWNER by ENGINEER in writing, OWNER <br />shall retain five percent (5%) of the payment amount due to CONTRACTOR until final <br />completion and acceptance of all work to be performed by CONTRACTOR under the Contract <br />Documents. Pursuant to Florida Statutes section 218.735(8)(b), fifty percent (50%) <br />completion means the point at which the County as OWNER has expended fifty percent <br />(50%) of the total cost of the construction services work purchased under the Bid and <br />Specification Documents, together with all costs associated with existing change orders and <br />other additions or modifications to the construction services work provided under the <br />Contract Documents. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.