Laserfiche WebLink
EXHIBIT A - SCOPE OF WORK <br />It is our understanding that the COUNTY intends to add services to its original scope for the Kroegel <br />Homestead project located in Sebastian, Florida, for the inclusion of construction inspections and <br />certifications. <br />Construction Services <br />Construction inspection and project certification services shall include: <br />1. Attendance of a pre -construction meeting for EOR and inspector <br />2. Shop drawing review of civil site components <br />3. One (1) inspection during subbase construction <br />4. One (1) inspection for pavilion pad formboards <br />S. One (1) inspection for sidewalk formboards <br />6. Two (2) site visits for water service inspection and testing <br />7. Two (2) site visits for sewer service inspection and testing <br />8. Two (2) site visits for drainage infrastructure inspections <br />9. One (1) site visit for punch -list for County certification <br />10. One (1) site visit for final County inspection walkthrough <br />11. Two (2) additional site visits as required — will not be billed if not used <br />12. Review of test reports and as-builts provided by others <br />13. Coordination as necessary with County, County representative and Site Contractor during <br />construction <br />14. Certification by EOR to County and Florida Dept. of Environmental Protection <br />NOTE: Above inspections or site visits are based on a 2.5 -hour time period. <br />Site Plan Modification <br />We understand the County wishes to modify the approved site plan to phase the project for <br />construction of the bathroom building in a Phase 2. These services shall include: <br />1. Preparation of a phased site plan. <br />2. Preparation and submittal of the Indian River County Administrative Approval application. <br />3. Address and submit one (1) round of comments regarding the AA submittal. <br />DELIVERABLES <br />The Consultant shall provide the COUNTY with the following: <br />• One (1) hard set and one (1) pdf copy of approved civil construction plans, signed and sealed, for <br />bidding purposes <br />• Two (2) hard copies of plans for pre -construction meeting, signed and sealed <br />