My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-157C
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-157C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:01:38 AM
Creation date
9/10/2020 10:59:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/18/2020
Control Number
2020-157C
Agenda Item Number
8.AI.
Entity Name
MBV Engineering, Inc.
Subject
Hallstrom House Farmstead various site improvements Work Order 18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architectural Construction Services <br />Architect <br />• Shop Drawing review of Architectural items <br />• Responses to Request for Information <br />• (3) visits during construction <br />MEP <br />• Shop Drawing review of MEP items <br />• Responses to Request for Information <br />• (2) visits during construction <br />Structural <br />• Shop Drawing review of Structural items <br />• Responses to Request for Information <br />• (2) visits during construction <br />NOTE: Above inspections are based on a round-trip duration of 2.5 hours each. The above <br />inspections are based on reasonable construction inspection sequencing and does not include <br />additional site inspections due to failed tests or contractor scheduling errors. <br />EXHIBIT B - SCHEDULE <br />Upon authorization to proceed by the COUNTY, the above described services will be provided based <br />on the following schedule: <br />• Initial Submittal (30% design drawings) 1 month from issuance of Notice to Proceed <br />• Permit Plans Submittal (60% design drawings) 2.5 months from issuance of Notice to Proceed <br />• Final Submittal (100% design drawings) 5.5 months from issuance of Notice to Proceed <br />EXHIBIT C - DELIVERABLES <br />The CONSULTANT shall provide the COUNTY with the following at the designated milestones: <br />• Initial (30%) completion: <br />o Two (2) sets of plans in 24" x 36" format <br />o One (1) Opinion of Probable Cost (OPC) <br />o One (1) CD with drawings in PDF format <br />• Permit Plans (60%) completion: <br />o Two (2) sets of plans in 24" x 36" format <br />o One (1) Opinion of Probable Cost (OPC) <br />o One (1) CD with drawings in PDF format <br />• Final (100%) completion: <br />o Two (2) sets of plans in 24" x 36" format (signed & sealed) <br />o One (1) Opinion of Probable Cost (OPC) <br />o One (1) electronic version of the plans in pdf and CAD format <br />
The URL can be used to link to this page
Your browser does not support the video tag.