Laserfiche WebLink
Work Order No. 33 <br />431d Avenue/ S. Relief Canal <br />Bridge Replacement Project <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately nine (9) months from the Notice to Proceed (NTP). <br />NTP <br />Initial Submittal (40% Design Drawings) <br />Interim Submittal (80% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />contingent upon BOCC approval <br />5 months following NTP <br />7 months following NTP <br />9 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 9of10 <br />