Laserfiche WebLink
Design Services: <br />1. Prepare a design modification at 81St Street, involves the replacement of an <br />existing 54" CMP with a 48" RCP from the existing headwall for the 48" RCP crossing 58th <br />Avenue. The replacement 48" RCP shall be doweled into the existing headwall and collar used <br />to secure it into place. The replacement 48" RCP shall be extended east to the canal with a rip <br />rap headwall. Coordinate with Indian River Farms Water Control District. Prepare permit, <br />update, bid schedule, modify road plan and profile sheet, prepare detail of wall connection, <br />prepare new drainage plan and profile sheet. ($3,500 LS) <br />2. Prepare a design modification at 81St Street, a roadside drainage swale parallel <br />with 58`h Avenue, on the east side of the road should be designed that extends approximately <br />400' north and 1200-1400' south of the replacement 48" RCP at 81" Street. The drainage swale <br />should be sloped to drain to a sump estimated to be about 300' south of the replacement 48" RCP <br />at 81St Street. At the sump, a Type "E" drainage structure will be located with a 24" RCP pipe <br />extending east to the canal with a rip rap headwall. Coordinate with Indian River Farms Water <br />Control District. Prepare permit, update bid schedule, modify road plan and profile sheet, <br />prepare detail of wall connection, prepare new drainage plan and profile sheet. ($2,000 LS) <br />3. Prepare a design modification for replacement of failed pipes at 73rd Street, for the <br />existing drainage system which consists of four pipes and a sand -cement sack headwall on all <br />four sides. The sand sack -cement walls will be replaced with a box structure estimated to be 6' x <br />8' with Type 7 manhole top. To the west, going under 58th Avenue, is an existing 60" CMP that <br />will be removed and replaced with a 54" RCP. To the north is an existing 42" CMP that will be <br />removed and replaced with 42" HP (High Performance Polypropylene Pipe). To the east is an <br />existing 60" ADS N-12 that was recently constructed and will remain. To the south is an <br />existing 42" CMP that will be removed and replaced with 42" HP (High Performance <br />Polypropylene Pipe). Prepare permit, update bid schedule, modify road plan and profile sheet, <br />prepare detail of wall connection, prepare new drainage plan and profile sheet. ($4,500 LS) <br />4. Assist with submittal reviews, respond to RFIs, interpretation of the drawings and <br />other design support tasks is $1,840. <br />TOTAL L UMP SUM FEE................................................................ $11,840.00 <br />