Laserfiche WebLink
DEP v. IRCUD Central Gifford WWTF <br />OGC No. 20-0891 <br />Page 7 of 14 <br />Exhibit A <br />P2 Project Template <br />A. Project Description: (Summarize P2 Projects selected. Describe the processes or <br />operations to be modified, and the specific changes to be made. Include details such as <br />the specific equipment to be installed, materials to be substituted, and the actual changes <br />to be made to processes or operations. Include manufacturer or vendor information, and <br />specifications.) <br />B. Environmental and Economic Benefits: (Explain why and how each Project proposed <br />constitutes P2. <br />Specify how each material, chemical, water and energy is saved, and from which <br />processes or operations. Specify how each solid and hazardous waste, industrial <br />wastewater and air emissions is generated, the waste type, and from which processes or <br />operations. Describe generally in paragraph format. <br />Estimate the annual savings in resources - raw materials, chemicals, water, and energy at <br />the processor operation front end. Estimate the annual reductions in wastes solid and <br />hazardous waste, wastewater, and air emission reductions at the processor operation back <br />end. <br />Figures quoted should represent weights or volumes annually, and should be equalized <br />for production rate changes. Associated cost savings should be included. Describe <br />specifically using the tables provided. <br />Complete the first table for each Project individually. Add or average corresponding <br />figures from each Project table to complete the Summary table, for multiple Projects.) <br />