2020-178
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:43:22 AM
Creation date
9/11/2020 10:31:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
08/18/2020
Control Number
2020-178
Agenda Item Number
15.B.7.
Entity Name
Thalle Construction Co., Inc.
Subject
Change order No. 8 Release of retainage and final pay for completion IRC Landfill
Segment 3 Cell 2 Expansion Segment 2 Partial Closure,
and Landfill Gas Collection System Expansion.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change In Contract Summary Log <br />Owner. Indian River County Engineer: CDMSmithlnc. <br />Solid Waste Disposal District <br />Contractor: Thalle Construction Company Date: August 6, 2020 <br />Project: IRC Landfill Segment 3 Cell 2 and Segment 2 Partial Closure and landfill Gas System Expansion <br />T.hln 1 rh...nu n-4— — a 1 — <br />Ible 2. Time Impact to Project <br />CO No. 6(days) <br />Milestone dotes <br />CO No. 71 days) <br />Mkt—dabs <br />CO No.8 <br />Milestone dotes <br />Date Achkwed <br />Dogs beyond <br />Milestone <br />Days <br />Recommended by <br />OS 09 18 CO No 2 (days) <br />// ( r l <br />Milestone dates <br />Item Na. <br />Reference <br />Date Submitted <br />Descriptbn <br />Contractor <br />Changein <br />Addition to <br />Requested Change <br />Engineer's Comments <br />nded <br />Recommended <br />Etp er, Charge <br />Allocated to <br />ARomtedto <br />21 -Jan -20 <br />8-1an-20 <br />-13 <br />dates <br />Proposal <br />ContractAmount <br />ContractAmount <br />in Contract Time <br />17 -Mar -19 <br />by Engineer <br />Engl <br />Order No.B <br />Cbsu2 Cott <br />Cell Cost <br />5-Selt <br />Thalia Letter <br />4 -May -19 0 <br />Request for time <br />27 <br />31 -May -19 <br />62 <br />1 -Aug -19 <br />Contractor was <br />42 <br />19-Nov- <br />ialComple[e 390 <br />3 -tun -19 0 <br />1 <br />dated <br />2/10/2020 <br />extension for seepage <br />31 -Aug -19 <br />0 <br />$ - <br />20 <br />hindered by Leachate <br />20 <br />$ - <br />$ - <br />$ - <br />2/20/2020 <br />re air. <br />stud team. <br />Florida Jet Clean ran <br />Request for <br />into pipe blockage <br />Work was in progress <br />Change for two <br />under the existing <br />and was better to <br />2 <br />additional days <br />2/13/2020 <br />Segment 2 Landfill <br />Attached <br />$ 15,005.27 <br />0 <br />complete than to <br />0 <br />$ 15,005.27 <br />$ - <br />$ 15,005.27 <br />to Jet Clean <br />which took two <br />remobilize and incurr <br />Pipe <br />additional days to <br />additional cost. <br />complete the video. <br />The Swale along the <br />Work was necessary to <br />Regrade Swale <br />north side of Segment <br />restore stormwater <br />3 <br />at the north <br />1/27/2020 <br />2 was regraded to <br />Attached email <br />$ 19,447.88 <br />0 <br />flow away from lift <br />0 <br />$ 19,447.88 <br />$ 10,890.81 <br />$ 8,557.07 <br />side of Segment <br />restore runoff flow to <br />station on the north <br />2 <br />the west. <br />side of Segment 2 <br />g• Coquina Shell Access <br />Materials were <br />Final Pay <br />verun <br />$2.00 <br />$ 20.00 <br />0 <br />confirmed with actual <br />0 <br />$ 20.00 <br />$ 20.00 <br />Applicaion <br />Overrun <br />quantities in surveys. <br />f. Fabric Formed <br />Materials were <br />5 <br />Final Pay <br />Concrete Riprap = <br />Material Overun <br />$10.00 <br />$ 500.00 <br />0 <br />confirmed with actual <br />0 <br />$ 500.00 <br />$ 500.00 <br />Appllwwn <br />Overrun <br />quantities in surveys. <br />c. 4 -Inch Solid SDR 11 <br />Materials were <br />6 <br />Final Pay <br />HDPE Forceain- <br />m <br />Material Owmn <br />$30.00 <br />$ 1,140.00 <br />0 <br />confirmed with actual <br />0 <br />$ 1,140.00 <br />$ 633.84 <br />$ 506.16 <br />Applicay <br />Overrun <br />quantities in surveys. <br />Tobi Re uested <br />$ 36,113.15 <br />20 <br />Total Recommended <br />1 20 <br />$ 36,113.15 <br />$ 12,024.65 <br />$ 24,088.50 <br />Ible 2. Time Impact to Project <br />CO No. 6(days) <br />Milestone dotes <br />CO No. 71 days) <br />Mkt—dabs <br />CO No.8 <br />Milestone dotes <br />Date Achkwed <br />Dogs beyond <br />Milestone <br />Liquidated Liq.idnted Damoges <br />Damages Rate Amo Amount <br />IT Dos <br />r <br />OS 09 18 CO No 2 (days) <br />// ( r l <br />Milestone dates <br />CO No. 3 (days) <br />! r <br />Mikstone dates <br />CO No. 4 (days) <br />Milestone dates <br />CO No. 5 da / Milesta ne dotes <br />l rs <br />CO No. 6(days)Milestone <br />Milestone <br />42 <br />19 -Nov -19 <br />43 <br />1 -Jan -20 <br />20 <br />21 -Jan -20 <br />8-1an-20 <br />-13 <br />dates <br />lezcane 1 180 <br />5 -Nov -18 105 <br />18 -Feb -19 <br />27 <br />17 -Mar -19 <br />62 <br />18 -May -19 <br />68 25 -Jul -19 <br />42 <br />5-Selt <br />lest... 2 360 <br />4 -May -19 0 <br />4 -Ma -19 <br />27 <br />31 -May -19 <br />62 <br />1 -Aug -19 <br />68 8 -Oct -19 <br />42 <br />19-Nov- <br />ialComple[e 390 <br />3 -tun -19 0 <br />3 -tun -19 <br />27 <br />30.Jun-19 <br />62 <br />31 -Aug -19 <br />68 7 -Nov -19 <br />42 <br />19 -Dec - <br />NPT <br />CO No. 6(days) <br />Milestone dotes <br />CO No. 71 days) <br />Mkt—dabs <br />CO No.8 <br />Milestone dotes <br />Date Achkwed <br />Dogs beyond <br />Milestone <br />Liquidated Liq.idnted Damoges <br />Damages Rate Amo Amount <br />Milestone 1 <br />42 <br />5 -Se -19 <br />0 <br />S -Se -19 <br />0 <br />5-1e -19 <br />28 -Aug -19 <br />Milestone <br />42 <br />19 -Nov -19 <br />43 <br />1 -Jan -20 <br />20 <br />21 -Jan -20 <br />8-1an-20 <br />-13 <br />$ 900.00 $ <br />Final Complete <br />42 <br />19 -Dec -19 <br />43 <br />31 -Jan -20 <br />20 <br />20 -Feb -201 <br />20 -Feb -20 <br />0 <br />$ 650.00 $ <br />262 <br />Jame S.l.nange In l.Ontract Price <br />New Controcl Total Convect <br />Description I ContractAmount I Change Amount Contlngency <br />No. 4 <br />Order No.7 <br />Order No. 8 <br />304 <br />262 <br />262 <br />
The URL can be used to link to this page
Your browser does not support the video tag.