|
as those applicable to the bond otherwise required. The determination of the value of an
<br />alternative form of security shall be made by the OWNER.
<br />B. Such Bond shall continue in effect for one (1) year after acceptance of the Work by the OWNER.
<br />C. The OWNER shall record the Public Construction Bond with the Public Record Section of the
<br />Indian River County Courthouse located at 200016th Avenue, Vero Beach, Florida 32960.
<br />ARTICLE 7 - INDEMNIFICATION
<br />7.01 CONTRACTOR shall indemnify and hold harmless the OWNER, a" d its commissioners, officers,
<br />employees, and agents, from liabilities, damages, losses and costs;` including, but not limited to,
<br />X � "
<br />reasonable attorney's fees, to the extent caused by the neg(igence; recklessness, or intentional
<br />wrongful misconduct of the CONTRACTOR and persons emplo'ye''or util zed,by the CONTRACTOR
<br />in the performance of the Work.
<br />r
<br />r
<br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS.
<br />8.01 In order to induce OWNER to enter into thi greement CONTRACTORnmakes the following
<br />representations:
<br />A. CONTRACTOR has examinedfand carefully.studied :the Contract,Docu_ ments and the other related
<br />data identified in the Invitation to Bid,documents .;j �.
<br />B. CONTRACTOR has visit d'the Site and become familiar with and is satisfied as to the general, local,
<br />and Site conditions that may affect co'strprogress,'and°performance of the Work.
<br />C. CON
<br />that
<br />familia' it h and'is satisfied as to:all federal state and local Laws and Regulations
<br />D. CONTRACTOR has
<br />/uadditional or sub
<br />g
<br />�
<br />concernin condil `> -_
<br />Site which..may of
<br />1 the means; metbi
<br />pro g res',and'performance�of the Work.
<br />tamed -and caref Ily studied (or assumes responsibility for having done so) all
<br />mentary:examinations, investigations, explorations, tests, studies, and data
<br />is (surface; -subsurface, and Underground Facilities) at or contiguous to the
<br />(cost,- progress, or performance of the Work or which relate to any aspect of
<br />,,techniques, sequences, and procedures of construction to be employed by
<br />ding applying the specific means, methods, techniques, sequences, and
<br />procedures OT -construction, if any, expressly required by the Contract Documents to be employed
<br />by CONTRACTOR; an`d safety precautions and programs incident thereto.
<br />E. CONTRACTOR -does not consider that any further examinations, investigations, explorations, tests,
<br />studies, or data are necessary for the performance of the Work at the Contract Price, within the
<br />Contract Times, and in accordance with the other terms and conditions of the Contract
<br />Documents.
<br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at
<br />the Site that relates to the Work as indicated in the Contract Documents.
<br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and
<br />observations obtained from visits to the Site, reports and drawings identified in the Contract
<br />137
<br />
|