Laserfiche WebLink
Subsurface Utility Eneineerine Services <br />Designating Services <br />Regular Rate <br />Emereency/On Call Services <br />Mapper <br />Night/Weekend/Overtime <br />Project Manager <br />$139.00 / per hour <br />$208.50 <br />Senior Technician <br />$103.00 / per hour <br />$154.50 <br />2 Man SUE Crew <br />$198.00 / per hour <br />$297.00 <br />3 Man SUE Crew <br />$251.00 / per hour <br />$376.50 <br />GPR Bore Route <br />$599.50 <br />$898.50 <br />Vacuum Excavation (Test Holes/WH) <br />$217.00 / per hour <br />$336.00 <br />1 Test Hole/Dirt <br />$492.00 <br />$738.00 <br />1 Test Hole/Asphalt/Concrete <br />$611.00 <br />$916.50 <br />2 - 19 Test Holes/Dirt <br />$421.00 / each <br />$631.50 <br />2 - 19 Test Holes/Asphalt/Concrete <br />$480.00 / each <br />$720.00 <br />20 - 49 Test Holes/Dirt <br />$385.00 / each <br />$577.50 <br />20 - 49 Test Holes/Asphalt/Concrete <br />$433.00 / each <br />$649.50 <br />50 - 99 Test Holes/Dirt <br />$332.00 / each <br />$498.00 <br />50 - 99 Test Holes/Asphalt/Concrete <br />$385.00 / each <br />$577.50 <br />100 or more Test Holes/Dirt <br />$295.00 / each <br />$442.50 <br />100 or more Test Holes/Asphalt/Concrete <br />$336.00 / each <br />$504.00 <br />All Exploratory Excavation Projects $343.00 / per hour $514.50 <br />Test Holes deeper than 10 feet may be charged at the Exploratory Excavation Rate. <br />Larger excavation projects which require specialized equipment (shoring, de -watering, etc.) will be quoted on a task by task basis. <br />Vacuum Excavation for Environmental Services <br />Vacuum Excavation for Monitoring Wells/Soil Samples when requirements dictate vacuum or hand digging down 8 feet to 10 feet <br />prior to drilling. (3"-4" in diameter, 8' to 10' deep, concrete/asphalt removed if necessary) <br />1-9 Monitoring Wells/Soil Samples $301.00 / each $451.50 <br />10-19 Monitoring Wells/Soil Samples $242.00 / each $363.00 <br />20-49 Monitoring Wells/Soil Samples $182.00 / each $273.00 <br />Survey Services for Utility Projects <br />Project Manager/Professional Surveyor & <br />$143.00 / per hour <br />$214.50 <br />Mapper <br />Two Person Survey Field Team <br />$143.00 / per hour <br />$214.50 <br />Three Person Survey Field Team <br />$181.00 / per hour <br />$271.50 <br />Clerical <br />$ 62.00 / per hour <br />Concrete Radar Mapping/imaging <br />(concrete assessment/inspection, grid scans & <br />debris assessment) <br />1 Person Crew <br />$217.00 / per hour <br />$336.00 <br />Closed Circuit Televising (CCN) Services (will be quoted on a task by task basis per requirements) <br />Maintenance of Traffic (MOT) <br />If required MOT specialist will be contracted and the cost will be passed on with a 10% mark-up for coordination. <br />Off Duty Officer(s) (if Required per permitting) billing will be a pass-through cost and are not included in the per lane closure cost <br />listed below. <br />Per Lane Closure $731.00 $931.00 <br />Sidewalk Closures $200.00 $300.00 <br />Mobilization <br />Per Project in Excess of 50 Miles from Home $900.00 $1,350.00 <br />Office Location <br />Per Diem/Lodging Expenses <br />Per Day Two Person Crew $330.00 <br />Per Day Three Person Crew $450.00 <br />If HAZWOPER CERTIFIED personnel are required there will be a 20% increase in the Hourly Rate. <br />Overtime rates will be charged for jobs requiring night work or Emergency/On-Call Services <br />