My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-190
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:56:31 AM
Creation date
9/25/2020 12:58:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/15/2020
Control Number
2020-190
Agenda Item Number
8.R.
Entity Name
Carter & Associates, Inc.
Subject
South Prong Preserve Design & Engineering Services
Work Order #3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parcel, 2) 200' x 300' area on the southwest corner of the Ryall parcel, 3) right-of-way area north <br />and south of County Road 510 along the frontage of the subject parcels, and 4) quarter -mile long <br />accessible trail fiom south of the Shadowbrook development site. Topographic survey to include <br />spot elevations on approximately 50 -foot intervals to obtain sufficient information to complete <br />the required grading plan, protected tree locations with 4" or greater DBH, and wetland <br />delineation flagged by the CLIENT. Future site-specific surveys for potential trail and <br />boardwalk locations throughout the parcels will be performed separately under a new purchase <br />order from the CLIENT. <br />Deliverables for this task will include 24"x36" full-sized drawings of the survey signed and <br />sealed by a Professional Surveyor and Mapper. <br />TASK 3 - MASTER SITE PLAN <br />After coordinating with the abovementioned entities outlined in TASK 1 and obtaining the <br />survey for design outlined in TASK 2, the ENGINEER will design the Master Site Plan that <br />addresses the concerns of all the entities and facilitate the desires of the CLIENT. <br />ENGINEER will coordinate with selected architect to produce preliminary building plans <br />including proposed floor plan, renderings and materials for CLIENT approval. <br />Once the Master Site Plan is approved by CLIENT, ENGINEER will attend preapplication <br />meetings with Indian River County to receive preliminary comments on the Master Site Plan <br />prior to the creation of construction documents outlined in TASK 4. <br />Deliverables for this task will be renderings for each portion of the Master Site Plan design and <br />jurisdictional feedback from preapplication meetings, as outlined above. <br />TASK 4 -DEVELOPMENT OF PROJECT CONSTRUCTION PLANS <br />ENGINEER will develop a dimensional site plan conforming to local permitting requirements. <br />Site plan will depict pedestrian accessible trails/boardwalks between the two subject parcels and <br />proposed parking lots, driveway connections, and the building (pavilion). Prepare site data to <br />include land use calculations, setbacks, and open space. Complete and submit applications for <br />site plan approval including all checklist items required by the Indian River County Planning <br />Department. <br />ENGINEER will prepare the following documents as part of the site plan submittal: <br />• Stormwater management report for proposed stormwater feature to include flood <br />routings, retention sizing, discharge calculations, and recovery analysis as required. <br />Develop drainage and grading plans for proposed parking lots and building (pavilion). <br />• Utility construction plan for extension of water line to proposed pavilion. <br />N:WHBIPROPOSAL120.295E South Prong Slough.doc Page 4 of 8 (f�� '([Seivin f.1010a <br />02020 by CAI C- l Since 1911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.