My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-190
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:56:31 AM
Creation date
9/25/2020 12:58:24 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER will review contractor's material submittals and scheduling. Construction inspection <br />services will be provided for the duration of construction in order to ensure that the contractor's <br />work conforms to the requirements of the project design drawings and specifications. Provide <br />certification upon completion of construction and review of contractor provided as-builts. <br />TASI{ 7 — REIMBURSABLE EXPENSES <br />Reimbursable expenses, such as prints, copies, vellum, postage, etc. <br />SECTION 3: ENGINEERING SCOPE ASSUMPTIONS: <br />In developing this Scope of Services, ENGINEER represents to the CLIENT that the following <br />assumptions have -been-made-and -that--deviation-from-these-assumptions-may-require--additional <br />work and compensation on behalf of CLIENT to the ENGINEER. <br />1. This proposal specifically excludes all application and/or impact fees, which shall be the <br />responsibility of CLIENT. <br />2. Fees for the services of the architect and geotechnical engineer are not included with this <br />proposal and will be billed at cost plus 10% upon approval by the CLIENT. <br />3, This Scope of Services specifically excludes preparation of legal documents, easement <br />descriptions, structural, mechanical, electrical, landscape, and architectural work. <br />4. Wetland planting design drawings, plant lists, and installation will be provided by others. <br />5. Civil engineering design and permitting fees for off-site improvements, such as turn lanes or <br />utility line extensions, are not included with this proposal. <br />6. Permitting for disposal of any existing on-site hazardous or industrial waste material, or any <br />other underground, unforeseen issues is not included with this proposal. <br />7. Construction stakeout and as-builts are not included with this proposal. <br />RMHEITROPOSAU20-295E South Prong Slough.doc Page 6 of 8 A I Seivilig Florida <br />02020 by CAI —i UL 11 sime 1911 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.