Laserfiche WebLink
EXI HBIT B <br />ESTIMATE FOR ENGINEERING SERVICES <br />F:\Utilities\UTILITY - Engineering\WATER\WTP - South RO\Well No. 7 Construction -UCP 4124\Admin\IRCU Floridan Well Additional SDC Scope 9.8.20 April 2018 Contract.docx Page 3 of 3 <br />PROJECT: IRCU Floridan Well ADDITIONAL SDCS <br />SHEET 1 <br />OF 1 <br />' <br />CLIENT: Indian River County Utilities <br />FILE NO. <br />ESTIMATOR MDM <br />DATE: 8.16.20 <br />DESCRIPTION: <br />Additional Oversight - Floridan Wells South Plant <br />Design, permitting, Construction phase <br />DIRECT LABOR ( MAN-HOURS ) <br />PRINC <br />REG <br />SEN PROF DES/ EXP <br />PROF JL/FH P2 (JPF) CLK SUB <br />Dir Exp <br />(4.60%) <br />LINE <br />_. <br />TOTAL <br />NO. TASK <br />ADDITIONAL CONS''RLTCTIQN SVCS. <br />Additional Coordination/Observation <br />18 <br />70 <br />12 <br />$577 <br />13,129 <br />Additional Shop Dwg review <br />8 <br />36 <br />12 <br />$310 <br />7,042 <br />Additional Meetings <br />8 <br />16 <br />12 <br />$213 <br />4,845 <br />JLA onsite <br />8 <br />8 <br />4 <br />$27.274 <br />$139 <br />30,437 <br />Additional Startup & Operational testing (wellhead) <br />12 <br />60 <br />24 <br />$520 <br />11,824 <br />TOTAL HOURS'; <br />54 <br />190 <br />64 <br />$27,274 <br />$1,759 <br />67,277 <br />LABOR ($/HOUR)';' 235 <br />2251 <br />150 <br />105 <br />96 <br />SUBTOTAL I' <br />$12,1501 <br />$19,950 <br />$6,144 <br />$38,244 <br />F:\Utilities\UTILITY - Engineering\WATER\WTP - South RO\Well No. 7 Construction -UCP 4124\Admin\IRCU Floridan Well Additional SDC Scope 9.8.20 April 2018 Contract.docx Page 3 of 3 <br />