My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-159A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:09:12 AM
Creation date
10/1/2020 10:55:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2020
Control Number
2020-159A
Agenda Item Number
8.AM.
Entity Name
Proshot Concrete, Inc.
Subject
CR 512 Bridge Repairs
FDOT 884078 & 884079
Project Number
IRC-1727
Bid Number
2020048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: .20 <br />OWNER: Indian River County <br />CONTRACTOR - <br />CONTRACT FOR: C.R. 512 BRIDGE REPAIRS (FDOT #884078 & #884079) <br />Project No.: IRC -1727 <br />OWNER's Bid No. 2020033 <br />Project Description: The work will consist of structural and non-structural repairs to <br />support the rehabilitation of the eastbound (FDOT #884078) and westbound (FDOT <br />#884079) C.R. 512 bridges over the St. Sebastian River. <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />T <br />And T <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630-1 <br />F1Public Works\ENGINEERING DIVISION PROJECTS\1727 CR -512 EB & WB Bridge (88407879) Repairs\1-Admin\Bid DocumentsWlaster Contract Documents\00630 - <br />Certificate of Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.