My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-159A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:09:12 AM
Creation date
10/1/2020 10:55:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2020
Control Number
2020-159A
Agenda Item Number
8.AM.
Entity Name
Proshot Concrete, Inc.
Subject
CR 512 Bridge Repairs
FDOT 884078 & 884079
Project Number
IRC-1727
Bid Number
2020048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. become aware of the general nature of the work to be performed by OWNER and others <br />at the Site that relates to the Work as indicated in the Bidding Documents; <br />H. correlate the information known to Bidder, information and observations obtained from <br />visits to the Site, reports and drawings identified in the Bidding Documents, and all additional <br />examinations, investigations, explorations, tests, studies, and data with the Bidding Documents; <br />I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br />resolution thereof by ENGINEER is acceptable to Bidder; and <br />J. determine that the Bidding Documents are generally sufficient to indicate and convey <br />understanding of all terms and conditions for the performance of the Work. <br />4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br />Bidder has complied with every requirement of this Article 4, that without exception the Bid is <br />premised upon performing and furnishing the Work required by the Bidding Documents and <br />applying any specific means, methods, techniques, sequences, and procedures of construction <br />that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has <br />given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder <br />has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br />acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br />convey understanding of all terms and conditions for performing and furnishing the Work. <br />ARTICLE 5 - PRE-BID CONFERENCE <br />5.01 The date, time, and location for a Pre -Bid conference is specified in the Advertisement for <br />Bids. Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders <br />are HIGHLY. ENCOURAGED to attend and participate in the conference. ENGINEER will <br />transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in <br />response to questions arising at the conference. Oral statements may not be relied upon and will <br />not be binding or legally effective. <br />ARTICLE 6 - SITE AND OTHER AREAS <br />6.01 The Site is identified in the Bidding Documents. All additional lands and access thereto <br />required for temporary construction facilities, construction equipment, or storage of materials and <br />equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. <br />Easements for permanent structures or permanent changes in existing facilities are to be obtained <br />and paid for by OWNER unless otherwise provided in the Bidding Documents. <br />ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br />7.01 CONE OF SILENCE. Potential bidders and their agents shall not communicate in any <br />way with the Board of County Commissioners, County Administrator or any County staff other <br />than Purchasing personnel in reference or relation to this solicitation. This restriction shall be <br />effective from the time of bid advertisement until the Board of County Commissioners meets to <br />authorize award. Such communication may result in disqualification. <br />00200 - Instructions to Bidders REV 10-18 <br />00200-4 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11727 CR -512 EB 6 WB Bridge (88407879) Repairs\1-Admin0d Documents\Master Contract Documents\00200 - <br />Instructions to Bidders REV 10-18.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.