Laserfiche WebLink
6.11 Use of Site and Other Areas <br />A. Limitation on Use of Site and Other Areas <br />1. CONTRACTOR shall confine <br />construction equipment, the storage of <br />materials and equipment, and the operations of <br />workers to the Site and other areas ,permitted <br />by Laws and Regulations, and shall not <br />unreasonably encumber the Site and other <br />areas with construction equipment or other <br />materials or equipment. CONTRACTOR shall <br />assume full responsibility for any damage to <br />any such land or area, or to the owner or <br />occupant thereof, or of any adjacent land or <br />areas resulting from the performance of the <br />Work. <br />2. Should any claim be made by any <br />such owner or occupant because of the <br />performance of the Work, CONTRACTOR <br />shall promptly settle with such other party by <br />negotiation or otherwise resolve the claim by <br />arbitration or other dispute resolution <br />proceeding or at law. <br />3. To the fullest extent permitted by <br />Laws and Regulations, CONTRACTOR shall <br />indemnify and hold harmless OWNER, <br />ENGINEER, ENGINEER's Consultant, and the <br />officers, directors, partners, employees, <br />agents, and other consultants of each and any <br />of them from and against all claims, costs, <br />losses, and damages (including but not limited <br />to all fees and charges of engineers, architects, <br />attorneys, and other professionals and all court <br />or arbitration or other dispute resolution costs) <br />arising out of or relating to any claim or action, <br />legal or equitable, brought by any such owner <br />or occupant against OWNER, ENGINEER, or <br />any other party indemnified hereunder to the <br />extent caused by or based upon <br />CONTRACTOR's performance of the Work. <br />B. Removal of Debris During Performance of <br />the Work: During the progress of the Work CON- <br />TRACTOR shall keep the Site and other areas free <br />from accumulations of waste materials, rubbish, and <br />other debris. Removal and disposal of such waste <br />materials, rubbish, and other debris shall conform to <br />applicable Laws and Regulations. <br />C. Cleaning: Prior to Substantial Completion of <br />the Work CONTRACTOR shall clean the Site and <br />make it ready for utilization by OWNER. At the com- <br />pletion of the Work CONTRACTOR shall remove <br />from the Site all tools, appliances, construction <br />equipment and machinery, and surplus materials and <br />shall restore to original condition all property not <br />designated for alteration by the Contract Documents. <br />D. Loading Structures: CONTRACTOR shall <br />not load nor permit any part of any structure to be <br />loaded in any manner that will endanger the structure, <br />nor shall CONTRACTOR subject any part of the Work <br />or adjacent property to stresses or pressures that will <br />endanger it. <br />6.12 Record Documents <br />A. CONTRACTOR shall maintain in a safe place <br />at the Site one record copy of all Drawings, Specifica- <br />tions, Addenda, Written Amendments, Change <br />Orders, Work Change Directives, Field Orders, and <br />written interpretations and clarifications in good order <br />and annotated to show changes made during <br />construction. These record documents together with <br />all approved Samples and a counterpart of all <br />approved Shop Drawings will be available to ENGI- <br />NEER for reference. Upon completion of the Work, <br />these record documents, Samples, and Shop <br />Drawings will be delivered to ENGINEER for <br />OWNER. <br />6.13 Safety and Protection <br />A. CONTRACTOR shall be solely responsible <br />for initiating, maintaining and supervising all safety <br />precautions and programs in connection with the <br />Work. CONTRACTOR shall take all necessary <br />precautions for the safety of, and shall provide the <br />necessary protection to prevent damage, injury or <br />loss to: <br />1. all persons on the Site or who may <br />be affected by the Work; <br />2. all the Work and materials and equip- <br />ment to be incorporated therein, whether in - <br />storage on or off the Site; and <br />3. other property at the Site or adjacent <br />thereto, including trees, shrubs, lawns, walks, <br />pavements, roadways, structures, utilities, and <br />Underground Facilities not designated for <br />removal, relocation, or replacement in the <br />course of construction. <br />B. CONTRACTOR shall comply with all applica- <br />ble Laws and Regulations relating to the safety of <br />persons or property, or to the protection of persons or <br />property from damage, injury, or loss; and shall erect <br />and maintain all necessary safeguards for such safety <br />and protection. CONTRACTOR shall notify owners of <br />00700 - General Conditions REV 5-10-13 <br />00700-23 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1727 CR -512 EB & WB Bridge (88407879) Repairs\1-Admin\Bid Documents\Master Contract Documents\00700 -General Conditions <br />REV 5-10-13.doc <br />