Laserfiche WebLink
Project, shall include only the following items, and <br />shall not include any of the costs itemized in para- <br />graph 11.01.13. <br />2. Cost of all materials and equipment <br />furnished and incorporated in the Work, includ- <br />ing costs of transportation and storage thereof, <br />and Suppliers' field services required in <br />connection therewith. All cash discounts shall <br />accrue to CONTRACTOR unless OWNER <br />deposits funds with CONTRACTOR with which <br />to make payments, in which case the cash <br />discounts shall accrue to OWNER. All trade <br />discounts, rebates and refunds and returns <br />from sale of surplus materials and equipment <br />shall accrue to OWNER, and CONTRACTOR <br />shall make provisions so that they may be <br />obtained. <br />3. Payments made by CONTRACTOR <br />to Subcontractors for Work performed by <br />Subcontractors. If required by OWNER, CON- <br />TRACTOR shall obtain competitive bids from <br />subcontractors acceptable to OWNER and <br />CONTRACTOR and shall deliver such bids to <br />OWNER, who will then determine, with the <br />advice of ENGINEER, which bids, if any, will <br />be acceptable. If any subcontract provides that <br />the Subcontractor is to be paid on the basis of <br />Cost of \the Work plus a fee, the <br />Subcontractor's Cost of the Work and fee shall <br />be determined in the same manner as <br />CONTRACTOR's Cost of the Work and fee as <br />provided in this paragraph 11.01. <br />4. Costs of special consultants <br />(including but not limited to engineers, <br />architects, testing laboratories, surveyors, <br />attorneys, and accountants) employed for <br />services specifically related to the Work. <br />5. Supplemental costs including the <br />following: <br />a. The proportion of necessary trans- <br />portation, travel, and subsistence expenses of <br />CONTRACTOR's employees incurred in dis- <br />charge of duties connected with the Work. <br />b. Cost, including transportation and <br />maintenance, of all materials, supplies, equip- <br />ment, machinery, appliances, office, and <br />temporary facilities at the Site, and hand tools <br />not owned by the workers, which are <br />consumed in the performance of the Work, and <br />cost, less market value, of such items used but <br />not consumed which remain the property of <br />CONTRACTOR. <br />C. Rentals of all construction equip- <br />ment and machinery, and the parts thereof <br />whether rented from CONTRACTOR or others <br />in accordance with rental agreements <br />approved by OWNER with the advice of <br />ENGINEER, and the costs of transportation, <br />loading, unloading, assembly, dismantling, and <br />removal thereof. All such costs shall be in <br />accordance with the terms of said rental agree- <br />ments. The rental of any such equipment, ma- <br />chinery, or parts shall cease when the use <br />thereof is no longer necessary for the Work. <br />d. Sales, consumer, use, and other <br />similar taxes related to the Work, and for which <br />CONTRACTOR is liable, imposed by Laws and <br />Regulations. <br />e . Deposits lost for causes other than <br />negligence of CONTRACTOR, any Sub- <br />contractor, or anyone directly or indirectly <br />employed by any of them or for whose acts any <br />of them may be liable, and royalty payments <br />and fees for permits and licenses. <br />f. Losses and damages (and related <br />expenses) caused by damage to the Work, not <br />compensated by insurance or otherwise, sus- <br />tained by CONTRACTOR in connection with <br />the performance of the Work (except losses <br />and damages within the deductible amounts of <br />property insurance established in accordance <br />with paragraph 5.06.D), provided such losses <br />00700 - General Conditions REV 5-10-13 <br />00700-32 <br />FAPublic Works%ENGINEERING DIVISION PROJECTS\1727 CR -512 EB & WB Bridge (88407879) Repairs\1-Admin\Bid Documents\Master Contract Documents\00700 - General Conditions <br />REV 5-10-13.doc <br />