My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-159A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:09:12 AM
Creation date
10/1/2020 10:55:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2020
Control Number
2020-159A
Agenda Item Number
8.AM.
Entity Name
Proshot Concrete, Inc.
Subject
CR 512 Bridge Repairs
FDOT 884078 & 884079
Project Number
IRC-1727
Bid Number
2020048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: <br />EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: C.R. 512 BRIDGE REPAIRS (FDOT #884078 & #884079) <br />OWNER's Project No.: IRC -1727 <br />OWNER's Bid No.: 2020033 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />Q Unit Prices <br />Q Lump Sum <br />Q Other: <br />Q By Change Order: <br />Method of determining change in <br />Contract Times <br />Q Contractor's Records <br />Q Engineer's Records <br />Q Other: <br />Q By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />By: <br />By: <br />By: <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: <br />Date: <br />Date: <br />* * END OF SECTION * * <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1727 CR -512 EB & WB Bridge (88407879) Repairs\1-Admin\Bid <br />DocumentsWlaster Contract Documents\00948 - Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.