My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-159A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:09:12 AM
Creation date
10/1/2020 10:55:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2020
Control Number
2020-159A
Agenda Item Number
8.AM.
Entity Name
Proshot Concrete, Inc.
Subject
CR 512 Bridge Repairs
FDOT 884078 & 884079
Project Number
IRC-1727
Bid Number
2020048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�n g° Dr,TT <br />'CONH <br />I�TCRETE <br />SHOTCRETE CONTRACTORS & ENGINEERS <br />William Morris <br />4158 Musgrove Drive <br />Florence, AL 35630 <br />Experience: <br />2010 — Present Proshot Concrete, Inc. — Project Manager <br />2008-2010 CEM Enterprises, Inc. — Project Manager <br />1/08-6/08 Slaughter Construction, LLC — General Manager <br />2005— 2008 Kelzer Concrete Cutting Inc. — General Manager <br />1980 —2005 CEM Enterprises, Inc. — Vice President <br />Mr. Morris was involved in the following projects: <br />• Repairs to the Howard Franklin Bridge in Tampa for the Florida Department of Transportation - <br />$1,000,000.00 <br />• Multiple Florida Department of Transportation Bridge Maintenance and Repairs Contracts - <br />$100,000.00 to $1,500,000.00 <br />• Florida Department of Transportation Hurricane Recovery Emergency - $950,000.00 <br />• 100's of Florida DOT, US Postal Service, County and City projects ranging from $50,000.00 to over <br />$500,000.00 <br />• Florida DOT Rigid Pavement Replacement US Hwy 441, District V $1,200,000.00 <br />• Florida DOT Rigid Pavement Replacement Interstate 4, District V $900,000.00 <br />• Florida DOT Concrete Slab Replacement, Interstate 4, (subcontractor to Pneumatic Concrete) $1, <br />300, 000.00 <br />• Florida DOT Bridge/Joint Repair Projects with Push Button Contracts. These contracts are renewed <br />yearly for a 3-5 year period. <br />P.O. BOX 1636 •4158 MUSGROVE DRIVE • FLORENCE, ALABAMA 35631-1636 <br />TELEPHONE: (256) 764 - 5941 • TOLL FREE: (800) 631- 3141 • FAX: (256) 764 - 5946 <br />WWW.PROSHOTCONCRETE.COM <br />WE ARE AN EQUAL OPPORTUNITY EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.