My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-159A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:09:12 AM
Creation date
10/1/2020 10:55:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2020
Control Number
2020-159A
Agenda Item Number
8.AM.
Entity Name
Proshot Concrete, Inc.
Subject
CR 512 Bridge Repairs
FDOT 884078 & 884079
Project Number
IRC-1727
Bid Number
2020048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00200 - Instructions to Bidders <br />ARTICLE 1 - DEFINED TERMS <br />1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the <br />General Conditions and Supplementary Conditions. Additional terms used in these Instructions to <br />Bidders have the meanings indicated below which are applicable to both the singular and plural <br />thereof: <br />A. Bidder --The individual or entity who submits a Bid directly to OWNER. <br />B. -Issuing Office --The office from which the Bidding Documents are to be issued and where <br />the bidding procedures are to be administered. <br />C. Successful Bidder --The lowest responsible Bidder submitting a responsive Bid to whom <br />OWNER (on the basis of OWNER's evaluation as hereinafter provided) makes an award. <br />D. ENGINEER —References County Engineer or their designee. <br />ARTICLE 2 - COPIES OF BIDDING DOCUMENTS <br />2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, <br />stated in the Advertisement for Bids or Invitation to Bid may be obtained from the Issuing Office. <br />2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor <br />ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of <br />incomplete sets of Bidding Documents. <br />2.03 OWNER and ENGINEER in making copies of Bidding Documents available on the above <br />terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or <br />grant for any other use. <br />ARTICLE 3 - QUALIFICATIONS OF BIDDERS <br />3.01 To demonstrate Bidder's qualifications to perform the Work, within five days of OWNER's <br />request Bidder shall submit written evidence such as financial data, previous experience, present <br />commitments, and such other data as may be called for below. <br />A. Bidder must have at least five years' experience in the construction of similar projects of <br />this size and larger. <br />B. Bidder must have successfully constructed, as prime CONTRACTOR, at least three <br />projects similar in scope to this project. <br />C. Bidder must have good recommendations from at least three clients similar to the <br />OWNER. <br />D. The Bidder's superintendent and assistants must be qualified and experienced in similar <br />projects in all categories. <br />E. Bidder must be able to provide evidence of authority to conduct business in the jurisdiction <br />in which the project is located. <br />00200 - Instructions to Bidders REV 10-18 <br />00200-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1727 CR -512 EB & WB Bridge (88407879) Repairs\1-Admin\Bid Documents\Master Contract Documents\00200 - <br />Instructions to Bidders REV 10-18.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.