My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-212
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 12:23:42 PM
Creation date
10/14/2020 11:29:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/06/2020
Control Number
2020-212
Agenda Item Number
8.H.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Associates Bridge Repairs for CR 512 bridges over the St. Sebastian River
Amendment 1 to Work Order 16
Project Number
IRC-1727
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A — SCOPE OF WORK <br />CR 512 Bridge Repairs <br />The COUNTY desires the Consultant to provide post design services to support the structural and roadway <br />repairs associated with the CR 512 bridges over the Sebastian River. <br />A. Post Design Services: <br />During the Construction Phase, the Consultant will assist the COUNTY to provide design clarifications and <br />design field changes, as necessary. The scope of services contemplated to be provided within the <br />Construction Phase Services consists of the following: <br />• Attend pre -construction meeting. <br />• At the request of the County, the Project Engineer will be onsite to observe the construction by <br />the Contractor. During site visits, the Consultant will notify the COUNTY with any observed <br />discrepancies between the design intent and the contractor's activities. <br />• The Consultant will provide Contract Document interpretation and address RFI's from the <br />Contractor. <br />• The Consultant will review the Contractor's Shop Drawings for approval (or rejection.). <br />• The Consultant will review Change Orders, provide Field Orders and Work Orders, as <br />determined necessary. <br />• The Consultant will perform substantial completion inspection and one final inspection of the <br />construction project. The substantial completion inspection will include preparation of a <br />substantial completion form with an attached punch list of items to be completed prior to final <br />completion <br />• Once construction is substantially complete and the contractor has submitted as -built <br />construction drawings, The Consultant will review and prepare Record Drawings based on the <br />contractor's as -built drawings to indicate field changes made by the contractor and shown on <br />the as -built drawings and will follow County's requirements. <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.