My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-193A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-193A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 11:06:19 AM
Creation date
10/14/2020 12:43:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/22/2020
Control Number
2020-193A
Agenda Item Number
8.C.
Entity Name
One Source Restoration & Building Services, Inc.
Subject
Indian River County Courthouse Parking Garage Rehabilitation
Bid Number
IRC-1801A
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1801A <br />Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee <br />or agent of any of them. <br />SC -13.07 Correction Period <br />SC -13.07A. Delete the firstsentence of paragraph GC -13.07.A in its entirety and insert the following sentence <br />in its place <br />A. If within one year after the date of Final Completion or such longer period of time as may <br />be prescribed by Laws or Regulations or by the terms of any applicable special guarantee <br />required by the Contract Documents or by any specific provision of the Contract <br />Documents, any Work is found to be defective, or if the repair of any damages to the land <br />or areas made available for CONTRACTOR's use by OWNER or permitted by Laws and <br />Regulations as contemplated in paragraph 6.11.A is found to be defective, CONTRACTOR <br />shall promptly, without cost to OWNER and in accordance with OWNER's written <br />instructions: (i) repair such defective land or areas, or (ii) correct such defective Work or, if <br />the defective Work has been rejected by OWNER, remove it from the Project and replace it <br />with Work that is not defective, and (iii) satisfactorily correct or repair or remove and <br />replace any damage to other Work, to the work of others or other land or areas resulting <br />therefrom. <br />SC -13.07 B. Delete paragraph GC -13.07.8 in its entirety and insert the following sentence in its place <br />B. In special circumstances where a particular item of equipment is placed in continuous <br />service before Final Completion of all the Work, the correction period for that item may <br />start to run from an earlier date if so provided in the Specifications or by Written <br />Amendment. <br />SC -14.02 Progress Payments <br />SC -14.02.13.5. Delete paragraph GC-14.02.B.5.d in its entirety and insert the following paragraph in its place: <br />ENGINEER has actual knowledge of the occurrence of any of the events enumerated in <br />paragraph 15.02.A; or <br />SC -14.02.6.5. Add the following sentences at the end of paragraph GC -14.02.8.5: <br />e. OWNER has been required to pay ENGINEER additional compensation because of <br />CONTRACTOR delays or rejection of defective Work; or <br />OWNER has been required to pay an independent testing laboratory for subsequent <br />inspections, tests, or approvals taken after initial failing inspections, tests, or approvals. <br />SC -14.02.C.1. Delete paragraph GC -14.02.0.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />Supplementary Conditions - 00800-9 <br />P1Public Works\ENGINEERING DIVISION PROJECTSM01A IRC Courthouse Parking Garage Rehabilitation\1-Admin\Bids\Bid Documents\Bid Dcuments\DIV <br />0_5 Conditions of the Contract. docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.