My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-193A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-193A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 11:06:19 AM
Creation date
10/14/2020 12:43:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/22/2020
Control Number
2020-193A
Agenda Item Number
8.C.
Entity Name
One Source Restoration & Building Services, Inc.
Subject
Indian River County Courthouse Parking Garage Rehabilitation
Bid Number
IRC-1801A
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1— General Requirements, IRC -1801A <br />SECTION 01220 - PROGRESS MEETINGS <br />1.1 SCOPE <br />A. Date and Time: <br />1. Regular Meetings: As mutually agreed upon by ENGINEER and CONTRACTOR. <br />2. Other Meetings: On call. <br />B. Place: CONTRACTOR'S office at Project site or other mutually agreed upon location. <br />C. ENGINEER shall prepare agenda, preside at meetings, and prepare and distribute a <br />transcript of proceedings to all parties. <br />D. CONTRACTOR shall provide data required and be prepared to discuss all items on agenda. <br />1.2 MINIMUM ATTENDANCE <br />A. CONTRACTOR <br />B. SUBCONTRACTOR: <br />When needed for the discussion of a particular agenda item, CONTRACTOR shall require <br />representatives of Subcontractors or suppliers to attend a meeting. <br />C. CONSTRUCTION COORDINATION MANAGER <br />D. OWNER'S representative, if required. <br />E. Utility Representatives <br />F. Others as appropriate. <br />G. Representatives present for each party shall be authorized to act on their behalf. <br />1.3 AGENDA <br />Agenda will include, but will not necessarily be limited to, the following: <br />I. Transcript of previous meeting. <br />2. Progress since last meeting. <br />3. Planned progress for next period. <br />4. Problems, conflicts and observations. <br />S. Change Orders. <br />6. Status of Shop Drawings. <br />7. Quality standards and control. <br />8. Schedules, including off-site fabrication and delivery schedules. Corrective <br />measures, if required. <br />9. Coordination between parties. <br />10. Safety concerns. <br />11. Other business. <br />+ + END OF SECTION + + <br />Progress Meetings - 01220-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1801A IRC Courthouse Parking Garage Rehabilitation\1-Admin\Bids\Bid Documents\Bid Dcuments\DIV 1 GENERAL <br />REQUIREMENTS. docx — <br />
The URL can be used to link to this page
Your browser does not support the video tag.