My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/14/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2020 11:25:10 AM
Creation date
10/20/2020 11:18:59 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, Attachment D <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 102 <br />� <br />. TECO. ItskITH=NI NTHREVISED.sHEET NO ;s 815 <br />CANCELS �F`! rEIGHTH :REVISED SHEET NO 6 8'15 <br />TAMPA ELECTRIC <br />AN-EMERA'COMPANY <br />Miscellaneous Facilities Charles'. <br />NONSTANDARD FACILITIES AND SERVICES: <br />The customer shall pay all costs associated with additional company facilities and services that are <br />not considered: standard for providing lighting service, including but not limited to, the following: <br />1. relays; <br />2, distribution transformers installed solely for lighting service; <br />3. protective; shields; <br />.4. bird ,deterrent .d. evices; <br />5. light trespass shields; <br />6. light rotations, <br />7. Tight pole relocations; <br />8. devices required .by local regulations to control the levels or duration of illumination including <br />associated planning and engineering costs; <br />S. removal andreplacement of pavement required to install underground lighting cable; and <br />10, directional boring, <br />MINIMUM CHARGE: The monthly charge. <br />FUEL CHARGE: See Sheet Nos. 6:020 and 6.021. <br />ENERGY CONSERVATION CHARGE: :See Sheet Nos. 6.020 and 6.021. <br />CAPACITY CHARGE: See Sheet Nos, 6.020 and 6.021 <br />ENVIRONMENTAL COST RECOVERY CHARGE: See Sheet Nos. 6.020 and 6.021 <br />FLORIDA GROSS RECEIPTS TAX: See Sheet No. 6.021 <br />FRANCHISE FEE: See Sheet No. 6.021 <br />PAYMENT OF BILLS::See Sheet No. 6.022 <br />................. .................... <br />.SPECIAL CONDITIONS: <br />On customer -owned public street and highway lighting systems not subject to other rate schedules; the <br />monthly rate for energy served at primary or. secondary voltage, at the company's option, shall tie. <br />2.58369¢ <br />perk of metered usage plusa Basic Service'<Charge of $10.52 per month and'the. <br />applicable additional .charges as specified°on'Sheet Nos.:6:Q20 and 6.021, <br />Continued to Sheet No 6.826 <br />ISSUED BY: N. G. Tower. ,President DATEZFFECTIVE: daOti is -020 <br />aNDZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.