My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/14/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2020 11:25:10 AM
Creation date
10/20/2020 11:18:59 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 107 <br />Attachment D <br />Aft <br />TECO TWENTY-EIGHTH REVISED SHEET NO. 6.050 <br />AdrA_'TAMPA ELECTRIC CANCELS TWENTY-SEVENTH REVISED SHEET NO. <br />50 <br />AN EMERA G13MPANY 6'0 <br />GENERAL SERVICE NON DEMAND <br />SCHEDULE: GS. <br />AVAILABLE: Entire service area. <br />APPLICABLE: For lighting and power in establishments not classified as residential whose'. <br />energy consumption has not :exceeded 9,000 kWh in any one of the prior twelve (12)' <br />consecutive billingI..periods ending with the current billing period. For any billing period that <br />exceeds 35 ,days, the energy consumption shall be prorated to that of a 30 -day amount for <br />purposes .of administering this requirement. Resale not permitted, <br />CHARACTER OF SERVICE: Single or 3 :phase, 60 cycles and approximately 120 volts or <br />higher, of Company's option. <br />LIMITATION OF SERVICE: All service under this rate shall be furnished through one meter. <br />Standby service permitted on Schedule GST only.. <br />MONTHLY RATE: <br />Basic Service Charge:. <br />Metered accounts $18.06 <br />un -metered accounts $15:05 <br />Energy and Demand Charge: <br />i5.4480 per Mh <br />MINIMUM CHARGE: The Basic Service Charge. <br />EMERGENCY RELAY POWER. SUPPLY.` CHARGE: The monthly charge for emergency relay <br />power supply service shall be 0:168¢ per kWh of billing energy: This charge is in addition to <br />the compensation the customer must make to the Company as ;a contribution -in -aid of. <br />constructilon. <br />Continued to Sheet No.'6:051 <br />ISSUED BY: N. G. Tower, President DATE EFFECTIVE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.