Laserfiche WebLink
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 113 <br />Attachment D <br />TECO <br />TWENTY-FIFTH REVISED SHEET NO. 63340 <br />CANCELS TWENTY-FOURTH REVISED SHEET NO. 6.340 <br />AWPA <br />-TAMPA ELECTRIC <br />AN EMERA COMPANY <br />TIME OF DAY <br />..................... ...... . <br />INTERRUPTIBLE SERVICE <br />(CLOSED TO NEW BUSINESS AS OF.MAY 7, 2049) <br />i SCHEDULE: IST <br />AVAILABLE: Entire Service Area. <br />APPLICABLE: To 'be eligible for service under Rate Schedule IST, a customer must have <br />been taking interruptible service under rate schedules.IS-9, IST -1, IS -3, IST -3, S13I4, or SBI -3 <br />on May 6, 2009 and have signed the Agreement for the Purchase of Industrial Load <br />Management Service under Rate Schedule GSLM72. When electric service is desired at more <br />than. one location, each such location or point of delivery shall be considered. as a separate <br />customer. Resale not permitted. <br />CHARACTER OF SERVICE: The electric energy supplied under this schedule is three phase <br />primary voltage or higher. <br />LIMITATION OF SERVICE: Standby service is permitted only for customers who generate <br />less than 20% of their on. -site load requirements or whose generating equipment is used for <br />emergency purposes. <br />Basic Service Charge: <br />Primary Metering Voltage $ 624;05 <br />Subtransmission Metering Voltage $2;379.85 <br />Demand Charge: <br />$3.90 per KW of billing demand <br />.Energy Charge: <br />2.,5.130.per KWH <br />Continued to Sheet No. 6;345 <br />I. SUED BY: N. G. Tower, President <br />DATE: EFFECTIVE: <br />