My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/14/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2020 11:25:10 AM
Creation date
10/20/2020 11:18:59 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI,, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 117 <br />Aftâ–º TECO <br />TAMPA ELECTRIC <br />AN EMERA COMPANY <br />SCHEDULE: SBFT <br />Attachment D <br />THIRTEENTH REVISED SHEET NO 6.605 <br />CANCELS TWELFTH REVISED SHEET NO. 6.605 <br />TIME -OF -DAY <br />FIRM STANDBY AND SUPPLEMENTAL SERVICE <br />(OPTIONAL) <br />AVAILABLE: Entire service area. <br />APPLICABLE: Required for all self -generating Customers :whose generating capacity in <br />kilowatts (exclusive of emergency ;generation equipment) exceeds 20% of their site load in <br />kilowatts and who take firm service from the utility. Also available. to self -generating <br />Customers whose generating capacity in kilowatts does not exceed 20% of their site load in <br />kilowatts, bu..t who .agree to all the terms and conditions of this rate schedule. Resale riot <br />permitted. <br />CHARACTER OF SERVICE: A -C; 60 cycles; 3 phase, at any standard company voltage. <br />LIMITATION OF SERVICE: A 'Customer taking service under this :tariff :must sign a Tariff <br />Agreement for the Purchase of Firm Standby and Supplemental Service. (See Sheet No. <br />7.600) <br />MONTHLY RATE: <br />Basic Service Charge: <br />Secondary Metering Voltage $ 55.18 <br />Primary Metering Voltage $ 155.51 <br />Sut transmission. Metering Voltage $1,018.36 <br />CHARGES FOR STANDBY SERVICE: <br />Demand Charge`.. <br />$ 1.68 per kW -Month of Standby Demand <br />.(Local Facilities Reservation Charge) <br />plus the,gre.ater of: <br />1.55 per kW -Month of Standby Demand <br />(Power Supply Reservation Charge) or <br />$ 0.62 per kW -Day of Actual StandbyBilling Demand <br />(Power Supply Demand Charge) <br />Energy. Charae: <br />0.9170 per Standby kWh <br />Continued o. :Sheet No. 6.606 <br />ISSUED BY: N. G. Tower, President <br />DATE EFFECTIVE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.