Laserfiche WebLink
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 119 <br />Attachment D <br />'TECO.THIRTEENTH REVISED SHEET NO. 6.700 <br />TAMPA ELECTRIC <br />CANCELS TWELFTH REVISED SHEET NO. 6.7100 <br />- <br />AN EMERA COMPANY <br />INTERRUPTIBLE STANDBY AND SUPPLEMENTAL SERVICE <br />(CLOSED TO NEW BUSINESS AS OF MAY 7, 2009) <br />SCHEDULE: SBI <br />AVAILABLE: Entire service area. <br />APPLICABLE: Required for all self -generating customers eligible for service under rate <br />schedules IS or IST whose generating capacity in kilowatts (exclusive of emergency! <br />generation equipment) exceeds 20% of their site load in kilowatts. Also available to self <br />generating customers .eligible for service under rate schedules IS or IST whose generating <br />capacity in kilowatts does not exceed 20% of their site load in kilowatts, but who agree to all <br />the terms and conditions of this rate schedule. To be eligible for service under this rate', <br />schedule, a customer must have been taking interruptible service under rate schedules IS -1, <br />IST -1, IS -3, IST -3, 813I-1, Or SBI -3 on May 6, 2009 and have signed the Supplemental Tariff. <br />Agreement for the Purchase of Industrial Standby and Supplemental Load Management Rider <br />Service. Resale not permitted. <br />CHARACTER OF SERVICE: The electric energy supplied under this schedule is three,phase <br />primary voltage or higher <br />LIMITATION OF SERVICE; A customer taking service under this tariff must sign the Tariff <br />Agreement for the Purchase of Standby and Supplemental Service <br />MONTHLY RATE: <br />Basic Service Charge: <br />Primary Metering V61tage $649.14 <br />Subtransmission Metering Voltage $2,404.93 <br />Demand Charge: <br />$3.90 per KW -Month of Supplemental Demand (Supplemental Demand Charge) <br />$1.39 per KW -Month of Standby Demand (Local Facilities Reservation Ch.a..rge) <br />plus the greater of: <br />$1.20 per KW -Month of Standby Demand (Power Supply Reservation <br />Charge); or <br />$0,48 per KW -Day of Actual Standby Billing Demand (Power Supply <br />Demand Charge.) <br />Continued to Sheet No. 6.705 <br />ISSUED BY: N. G. Tower, President DATE EFFECTIVE: <br />