My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/14/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2020 11:25:10 AM
Creation date
10/20/2020 11:18:59 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 21 <br />Attachment A <br />WHEREAS, the Florida Legislature directed each utility to .file a ten-year Storm <br />Protection ;flan ("SPP") that explains the stone hardening programs and projects the utility will <br />implement to achieve the legislative objectives of reducing.restoration costs and outage tunes <br />associated with extreme Weather events and enhancing reliability. See Section 366:96(3), F,181 <br />WHEREAS; Ibe Florida Legislature directed the, florida Public Service (on}miss ou <br />("Commission") to conduct an annual proceeding to .determine the utility's prudently :incurred <br />SPP costs:and to allowthe utility to recover such costs througlra ch"arge separate .and apart from <br />its base rates;?to be referenced as the Storm Proteciion-Plan Cost Recovery Clause,("SPPCRC°'). <br />See Section 366.96(7), FS, <br />WHEREAS, Section 3.66.96(8), F.S., and Rule 25 6.03.1(6)(b)„F.A.C., provide :that, the. <br />SPP costs to be •recovered through She 'SPPCRC may not 4nclude costs ,recovered through the <br />utility's bawrates or any other cost recovery meebani5in; <br />WHEREWi Rule 25-6.030, F.A,C,, requires each utility to file an updated SPP at least <br />every three years that covers the utility's immediate ten-year planning period and specifies the <br />inrormation`to be included in each utility's SPP; <br />WHEREAS, Rule 25-6.031; F.A.C,; provides that after a utility has fled its SPP it may <br />petition the'Conimission for recovery of the costs associated with the SPP and implementation. <br />activities and specifies the information mbe. included in each utility's SPPCRC flings; <br />WHEREAS,.Qn March'3. 2020. the Commission opened:Docket .No. 20200070=E1 forthe <br />Gull` SPP and Docket No. 20200071-E1 for the FPL SPP; <br />z-zi <br />
The URL can be used to link to this page
Your browser does not support the video tag.