Laserfiche WebLink
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 87 <br />Attachment D <br />TQ, TWENTY-AUki-FIFTH REVISED SHEET N0: 8.3.40 Ec <br />CANCELS TWENTY -TSB -FOURTH REVISED SHEET <br />ej TAMPA ELE CTRIG - - *} 0 <br />AN EMERA COMPANY NO. 6.340 <br />TIME OF DAY <br />INTERRUPTIBLE SERVICE <br />(CLOSED TO NEW BUSINESS AS OF MAY 7, 2009) <br />SCHEDULE: IST <br />AVAILABLE: Entire Service Area. <br />APPLICABLE: To be -eligible for service under Rate Schedule IST, a customer must have <br />been taking interruptible service under rate schedules IS -1, IST -1, IS -3, IST -3, SBI -1, or SBI -3 <br />on May 6, 2009 and have signed the Agreement for the Purchase of Industrial Load <br />Management Service under Rate Schedule GSLM-2. When electric service is desired at more <br />than one location, each such location or point of delivery shall be considered as a separate <br />customer. Resale not permitted. <br />CHARACTER OF SERVICE: The electric energy supplied under this schedule is three phase <br />primary voltage or higher. <br />LIMITATION OF SERVICE Standby service is permitted only for customers who generate <br />less than: 20% of their on-site load requirements or whose generating equipment is used for'. <br />emergency .purposes. <br />Basic Service'Chame: <br />Primary Metering Voltage $ 624.05 <br />Subtransrrission Metering Voltage $2,379.85 <br />Demand Charge: <br />$3.96-90 per KW of billing" demand <br />Energy.Charge <br />`2:513¢ per KWH <br />Continued to Sheet No. 6.345 <br />ISSUED BY: N.:G. Tower, President DATE EFFECTIVE: : 2Q:?Q <br />M <br />