My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/14/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/14/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2020 11:25:10 AM
Creation date
10/20/2020 11:18:59 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/14/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 87 <br />Attachment D <br />TQ, TWENTY-AUki-FIFTH REVISED SHEET N0: 8.3.40 Ec <br />CANCELS TWENTY -TSB -FOURTH REVISED SHEET <br />ej TAMPA ELE CTRIG - - *} 0 <br />AN EMERA COMPANY NO. 6.340 <br />TIME OF DAY <br />INTERRUPTIBLE SERVICE <br />(CLOSED TO NEW BUSINESS AS OF MAY 7, 2009) <br />SCHEDULE: IST <br />AVAILABLE: Entire Service Area. <br />APPLICABLE: To be -eligible for service under Rate Schedule IST, a customer must have <br />been taking interruptible service under rate schedules IS -1, IST -1, IS -3, IST -3, SBI -1, or SBI -3 <br />on May 6, 2009 and have signed the Agreement for the Purchase of Industrial Load <br />Management Service under Rate Schedule GSLM-2. When electric service is desired at more <br />than one location, each such location or point of delivery shall be considered as a separate <br />customer. Resale not permitted. <br />CHARACTER OF SERVICE: The electric energy supplied under this schedule is three phase <br />primary voltage or higher. <br />LIMITATION OF SERVICE Standby service is permitted only for customers who generate <br />less than: 20% of their on-site load requirements or whose generating equipment is used for'. <br />emergency .purposes. <br />Basic Service'Chame: <br />Primary Metering Voltage $ 624.05 <br />Subtransrrission Metering Voltage $2,379.85 <br />Demand Charge: <br />$3.96-90 per KW of billing" demand <br />Energy.Charge <br />`2:513¢ per KWH <br />Continued to Sheet No. 6.345 <br />ISSUED BY: N.:G. Tower, President DATE EFFECTIVE: : 2Q:?Q <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.