My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-183C
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-183C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:51:42 AM
Creation date
10/20/2020 2:44:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/15/2020
Control Number
2020-183C
Agenda Item Number
8.I.
Entity Name
Boromei Construction, Inc.
Subject
Data Flow System Antenna and Tower Replacement Agreement
Area
West Regional Wastewater Facility
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Boromei <br />Construction, Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the <br />mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />Replace existing SCADA Data Flow System antenna and tower <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: <br />Bid Number: <br />Project Address <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />Data Flow System Antenna and Tower Replacement <br />2020049 <br />84058 th Street <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 60th day after Notice to <br />Proceed. <br />3.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER <br />will suffer financial loss if the Work is not completed within the times specified in paragraph 3.02 <br />above, plus any extensions thereof allowed in writing as a change order to this Agreement. <br />Liquidated damages will commence for this portion of work. The parties also recognize the delays, <br />expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER <br />if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and <br />CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall <br />pay OWNER $388.00 for each calendar day that expires after the time specified in paragraph 3.02 <br />for completion and readiness for final payment until the Work is completed and ready for final <br />payment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.