Laserfiche WebLink
BOOK <br />ON MOTION by Commissioner Tippin, SECONDED by <br />Commissioner Eggert, the Board unanimously <br />authorized staff to proceed with the design <br />engineering work in preparation for the special <br />assessment project. <br />SQUIR COUNTY EFFLUENT PUMP STATION AND <br />TRANSMISSION MAIN - WORK AUTHORIZATION <br />ADDENDUM #1 - CARTER & ASSOCIATES <br />The Board reviewed the following memo dated 3/29/95: <br />DATE: MARCH 29, 1995 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF IL SERVICES <br />PREPARED WILLIAM F. Mc IN <br />AND STAFFED CAPITAL PRO NEER <br />BY: DEPARTMEN ILITY SERVICES <br />SUBJECT: SOUTH COUNTY EFFLUENT PUMP STATION AND <br />TRANSMISSION MAIN <br />ENGINEERING WORK AUTHORIZATION <br />ADDENDUM NO. 1 <br />INDIAN RIVER COUNTY PROJECT NO. IIS -94 -02 -ED <br />BACKGROUND <br />94 FaU 9,93 <br />On February 15, 1994, the Indian River County Board of County <br />Commissioners approved a work authorization with Carter Associates, <br />Inc., for the above -referenced project. In our Effluent Master <br />Plan, additional piping must be provided at the West Regional <br />Wastewater Treatment Plant effluent disposal pumping station to <br />allow simultaneous receipt of effluent and simultaneous northward <br />pumping of effluent (see attached engineering addendum for detail). <br />This construction is now necessitated due to the constant effluent <br />pumping from the West Plant to the north during construction of the <br />West Regional Wastewater Treatment Plant expansion and Wetland <br />project. <br />ANALYSIS <br />The estimated construction cost is $100,650.00. The total <br />negotiated engineering fees associated with this work are <br />$13,212.00. This includes all design and survey work as well as <br />automated control valve design and placement. For details of this <br />engineering addendum, please see the attached Work Authorization <br />Addendum No. 1. Funding for this project will be from the impact <br />fee fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County.Commissioners approve Addendum No. 1 to the Carter <br />Work Authorization as presented. <br />30 <br />MAY 2 1995 <br />