Laserfiche WebLink
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />OFFICE OF PUBLIC TRANSPORTATION <br />WORK DESCRIPTION <br />GRADE CROSSING TRAFFIC CONTROL DEVICES <br />FORM 725.050.05•a <br />REPLACES 841•02 <br />01190 <br />PAGE 1 of I <br />COUNTY <br />SECTION <br />JOB NUMBER <br />ROAD NAME OR NUMBER <br />COUNTY NAME <br />PARCEL & RAN NUMBER <br />FAP NUMBER <br />88 <br />000 <br />6900 <br />SO. GIFFORD RD. <br />INDIAN RIVER <br />2(88560-SIGR) <br />RAILROAD COMPANY <br />THE FLORIDA EAST COAST RAILWAY CO. <br />INSTALL NEW FLASH. LIGHTS & GATES TO STDS. <br />A. JOB DESCRIPTION & LOCATION: Ann FTi.i. nN RniiTH CTnF- RFi nr•ATF TTFS <br />B. TYPE OF ROADWAY FACILITY: 2 LANE RURAL <br />C. FDOT/AAR XING NO. 272180—A RR MILE POST TIE: 225 + 2418' <br />D. TYPE SIGNALS PROPOSED: III CLASS: IV DOT INDEX NO.: 17882 <br />E. STATUS AND PROPOSAL: <br />1. EXISTING DEVICES: (See Agreement dated 11-26-56 ) <br />a. None -New Crossing. <br />b. Crossbuck and Disk.. <br />c. Flashing Signals with bisk. <br />d. Flashing Signals with Cantilever. <br />e. X Flashing Signals with Gates. <br />f. Flashing Signals with Cantilever and Gates. <br />2. PROPOSED DEVICES (Safety Index Rating ) <br />a. No revision required. <br />b. Crossbuck and Disk. <br />c. Flashing Signals and Disk. <br />d. Flashing Signals with Cantilever. <br />e. X Flashing Signals with Gates. <br />f. Flashing Signals with Cantilevers and Gates. <br />g. Relocate existing signal devices: <br />(1) (With -Without) addition of Gates. <br />(2) (With -Without) synchronization with highway traffic signals. <br />F. COMMUNICATION AND/OR POWER LINE ADJUSTMENTS: <br />1. N/A By Others ( <br />2. NLA By Railroad Company. <br />Company) <br />G. AUTHORITY REQUESTED: (Draft attached: Yes _ X No.) <br />1. —X Agreement (Third Party Participating INDIAN RIVER COUNTY ) <br />2. Supplemental Agreement No. <br />3. Crossing Permit. <br />4.. Estimate for Change Order No. <br />S• Letter of Authority. <br />¢. <br />-Letter of Confirmation (No Cost to Department). <br />H. OTHER REMARKS: <br />Negotiations to be completed by: OCT. i 199 <br />Signal installation target date: OCT. 1 1993 <br />Synchroniztion: (Draft, attached Yes X No) - <br />$21.441 <br />