Laserfiche WebLink
COST ESTIMATE FOR STH AVENUE (2ND STREET TO S. RELIEF <br />CANAL) - COUNTY PROJECT #8706 <br />1. ENGINEERING $ 1.261.20 <br />2. CONSTRUCTION $__15.400.00 <br />BASED ON $40/L.F. <br />Sub Total $__16..661.20 <br />3. ADMINISTRATION $ 504.92 <br />3.0305% OF <br />ENGINEERING & <br />CONSTRUCTION <br />TOTAL COST OF PROJECT <br />TOTAL F.F. 843.13 <br />$ 17.166.12 <br />75% TO BE PAID BY PROPERTY OWNER $ 12,874.59 <br />25% TO BE PAID BY COUNTY $ 4.291.53 <br />COST PER F.F. <br />8thavcst.mag <br />$ 15.27 <br />