Laserfiche WebLink
PROPOSAL TO PROVIDE <br />PROFESSIONAL ENGINEERING SERVICES <br />for <br />INDIAN RIVER COUNTY PARKS & CONSERVATION RESOURCES <br />JONES' PIER CONSERVATION AREA PROJECT <br />EXTENDED CONSTRUCTION ADMINISTRATION SERVICES <br />SECTION 1: SCOPE OF SERVICES <br />The following scope of services is based on a construction duration of six months (i.e. ending <br />February 28, 2021). <br />• Attend additional pre -construction meetings with the contractor and Indian River County <br />representative(s) regarding installation of culverts under Jungle Trail. <br />• Attend weekly progress meetings for the remaining duration of construction (through February 28, <br />2021). <br />• Monitor construction progress and coordinate with contractor to provide schedule updates for <br />duration of construction. Provide schedule updates to Indian River County. <br />• Coordinate with other design consultants (MBV, Dansco, Donadio) for required inspections or plan <br />clarifications. <br />• Respond to contractor Request for Information (BFI's) and provide construction clarifications as <br />needed. <br />• Review contractor's submittals and shop drawings and make recommendations. <br />• Review density tests and geotechnical reports. <br />• Consult with Indian River County for any change order requests. <br />• Review Pay Requests from the contractor and submit to the Indian River County following <br />approval. <br />• Coordinate with contractor for MOT plan during Jungle Trail closing. <br />• Conduct periodic construction observations/inspections to verify that the constriction is proceeding <br />in accordance with the plans and specifications.. <br />• Attend pump station start-up. <br />• Conduct final inspection(s) and prepare punch list of work deficiencies. <br />• Review as -built survey (to be provided by contractor) for compliance with approved plans. <br />SECTION 2: ENGINEERING SCOPE ASSUMPTIONS: <br />In developing this Scope of Services, ENGINEER represents to the INDIAN RIVER COUNTY <br />that the following assumptions have been made and that deviation fiom these assumptions may <br />require additional work and compensation on behalf of INDIAN RIVER COUNTY to the <br />ENGINEER. <br />1. This proposal specifically excludes all application and/or impact fees, which shall be the <br />responsibility of INDIAN RIVER COUNTY. <br />2. Building inspections related to the restroom/pavilion or any other building structure is not <br />included and assumed to be the responsibility of the ARCHITECT. <br />3. Construction stakeout and as-builts are not included with this proposal. <br />N:WH81PROPOSALUones Pier -Construction AdminWra6on2.doc Page 2 of 4 , <br />Sng Florida <br />02020 by CAI Sincee 1911 <br />