My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-223A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-223A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 12:37:50 PM
Creation date
11/3/2020 9:24:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/20/2020
Control Number
2020-223A
Agenda Item Number
8.D.
Entity Name
Carter Associates, Inc.
Subject
Jones Pier Conservation Area Construction
Amendment 1 to Work Order 3
April 17, 2018 Approved
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL TO PROVIDE <br />PROFESSIONAL ENGINEERING SERVICES <br />for <br />INDIAN RIVER COUNTY PARKS & CONSERVATION RESOURCES <br />JONES' PIER CONSERVATION AREA PROJECT <br />EXTENDED CONSTRUCTION ADMINISTRATION SERVICES <br />SECTION 1: SCOPE OF SERVICES <br />The following scope of services is based on a construction duration of six months (i.e. ending <br />February 28, 2021). <br />• Attend additional pre -construction meetings with the contractor and Indian River County <br />representative(s) regarding installation of culverts under Jungle Trail. <br />• Attend weekly progress meetings for the remaining duration of construction (through February 28, <br />2021). <br />• Monitor construction progress and coordinate with contractor to provide schedule updates for <br />duration of construction. Provide schedule updates to Indian River County. <br />• Coordinate with other design consultants (MBV, Dansco, Donadio) for required inspections or plan <br />clarifications. <br />• Respond to contractor Request for Information (BFI's) and provide construction clarifications as <br />needed. <br />• Review contractor's submittals and shop drawings and make recommendations. <br />• Review density tests and geotechnical reports. <br />• Consult with Indian River County for any change order requests. <br />• Review Pay Requests from the contractor and submit to the Indian River County following <br />approval. <br />• Coordinate with contractor for MOT plan during Jungle Trail closing. <br />• Conduct periodic construction observations/inspections to verify that the constriction is proceeding <br />in accordance with the plans and specifications.. <br />• Attend pump station start-up. <br />• Conduct final inspection(s) and prepare punch list of work deficiencies. <br />• Review as -built survey (to be provided by contractor) for compliance with approved plans. <br />SECTION 2: ENGINEERING SCOPE ASSUMPTIONS: <br />In developing this Scope of Services, ENGINEER represents to the INDIAN RIVER COUNTY <br />that the following assumptions have been made and that deviation fiom these assumptions may <br />require additional work and compensation on behalf of INDIAN RIVER COUNTY to the <br />ENGINEER. <br />1. This proposal specifically excludes all application and/or impact fees, which shall be the <br />responsibility of INDIAN RIVER COUNTY. <br />2. Building inspections related to the restroom/pavilion or any other building structure is not <br />included and assumed to be the responsibility of the ARCHITECT. <br />3. Construction stakeout and as-builts are not included with this proposal. <br />N:WH81PROPOSALUones Pier -Construction AdminWra6on2.doc Page 2 of 4 , <br />Sng Florida <br />02020 by CAI Sincee 1911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.