My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/15/2020
CBCC
>
Meetings
>
2020's
>
2020
>
09/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 2:22:38 PM
Creation date
11/9/2020 11:49:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/15/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 87 <br />Attachment D <br />AW <br />TEC TWENTY G. W4WFIFTH REVISED SHEET NO 6.340 <br />CANCELS TWENTY O -FOURTH REVISED SHEET <br />A Ad TAMPA ELECTRIC /1� <br />AN EMERA COMPANY .NO -6.340 <br />TIME OF LAY <br />INTERRUPTIBLE SERVICE <br />(CLOSED TO'NEW BUSINESS AS OF MAY 7, 2049) <br />SCHEDULE: IST <br />AVAILABLE: Entire Service Area. <br />APPLICABLE: To be eligible for service under Rate Schedule IST, a customer must have <br />been taking interruptible service under rate schedules IS -1, ISTA, IS -3, IST -3, SBI -9, or SBI -3 <br />on May 6, 2009 and have signed the Agreement for the Purchase of Industrial Load <br />Management Service under Rate Schedule GSLM 2. When electric service is desired at more <br />than one location, each such location or point of ,deliv.ery shall be considered as a separate <br />customer. Resale not permitted. <br />CHARACTER OF SERVICE: The electric energy supplied under this schedule is three phase <br />primary voltage or higher. <br />LIMITATION OF SERVICE: Standby service is permitted only for customers who generate' <br />less than 20% of their on-site load requirements or whose generating equipment is used for <br />emergency purposes. <br />Basic Service Charge: <br />Primary Metering Voltage $ 624.05 <br />Subtransrn ission Metering Voltage $2,379.85 <br />.Demand Charae: <br />$3:£;16-90 per KW of billing". demand <br />Energy Charge: <br />2:513¢ per .KWH <br />Continued to Sheet No. 6.345 <br />ISSUED BY: N. G. Tower; President <br />DATE EFFECTIVE: cla 8 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.