My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/15/2020
CBCC
>
Meetings
>
2020's
>
2020
>
09/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 2:22:38 PM
Creation date
11/9/2020 11:49:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/15/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 90 <br />Attachment D <br />AN► TECO►. CG\/CAITCFRi'r1.J <br />EIGHTEENTH REVISED SHEET NO. <br />�A `TAMPA ELECTRIC 6.601 <br />AN 6MERA COMPANY <br />CANCELS' IXJ- EVENTEENTH REVISED SHEET <br />NO. 6.601 <br />Continued from Sheet No. 6.600 <br />CHARGES FOR SUPPLEMENTAL SERVICE: <br />Demand Charge: <br />$4-1:�10.76'per kW -Month of 'Supplemental Billing Demand (Supplemental Billing'. <br />Demand Charge) <br />Energy Charge: <br />1 'Wo per Supplemental kWh <br />DEFINITIONS :OF THE USE PERIODS: All time periods stated in clock time. (Meters are <br />programmed to automatically adjust ,for changes from standard to daylight saving time and <br />vice -Versa:) <br />April 1 - October 31 November.1 - March 31 <br />Peak Hours: 12:00 Noon - 9:00 PM 6:00 AM -10:00 AM <br />(Monday -Friday) and <br />6:00 PM -10:00 PM <br />Off -Peak Hours: All other weekday hours, and all hours on Saturdays, Sundays, New', <br />Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas', <br />Day shall be off-peak. <br />BILLING UNITS: <br />Demand Units: Metered Demand - The highest measured 30 -minute interval kW demand', <br />served by the company during the month. <br />Site Load - The highest kW total of Customer generation plus deliveries by'. <br />the company less deliveries to the Company, occurring in the same 30 <br />minute interval, during the month. <br />Normal Generation - The generation level equaled or exceeded by the <br />Customer's generation 10% of the metered intervals during the previous' <br />twelve months. <br />Supplemental Billing Demand - The amount, if any, by which the highest <br />Site Load during any 30 -minute interval in the month exceeds Normal <br />Generation, but no greater than Metered Demand. <br />Continued to Sheet No. 6:602 <br />ISSUED BY N.. 'G. Tower, President <br />DATE EFFECTIVE•aRua� , 4,;2029 <br />�2-9a <br />
The URL can be used to link to this page
Your browser does not support the video tag.