My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/15/2020
CBCC
>
Meetings
>
2020's
>
2020
>
09/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 2:22:38 PM
Creation date
11/9/2020 11:49:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/15/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, Attachment D <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 102 <br />Aftk N NTHREVISED 9HE T NO -6.81 6 <br />CANCELS,SEV9 44;g GHTH REVISED SHEET NO '6.815 <br />TAMPA ELECTRIC <br />'AN EMERA'COMPANY <br />- <br />Miscellaneous,Facili#les Charges` <br />J.NON-STANDARD FACILITIES AND SERVICES: <br />The customer shall pay all costs associated with additional company facilities and services that are <br />not oonsldered standard for Providing lighting service including <br />but not limited to, the following: <br />1. relays; <br />2, distribution transformers installed solely for lighting service; <br />3. protectiveshields; <br />4. bird deterrent devices; <br />a light trespass shields; <br />6, light rotations; <br />7. light pole relocations; <br />8. devices required by local regulations to control the levels or duration of illumination including <br />associated planning and engineering costs; <br />9.. removal and replacement of pavement required to install underground lighting cable; and <br />10. directional boring. <br />MINIMUM CHARGE: The monthly charge. <br />FUEL CHARGE: See Sheet Nos, 6.020 and 6.021, <br />ENERGY CONSERVATION CHARGE: See Sheet Nos. 6:020 and 6.021: <br />CAPACITY CHARGE: See Sheet Nos. 6.020 and 6;021 <br />ENVIRONMENTAL COST RECOVERY CHARGE: See Sheet Nos. 6.020 and 6.021 <br />FLORIDA GROSS RECEIPTS TAX: See Sheet No. 6.021 <br />FRANCHISE FEE: See Sheet No. 6.021 <br />PAYMENT OF BILLS See Sheet No. 6.022 <br />............... ..................... <br />SPECIAL CONDITIONS: <br />On.customer-owned public street and highway lighting systems not subject to other rate schedules, the <br />monthly rate for energy serv2d at primaryar.eiecandar,y voltage, at, the company's option shall be <br />2.54pa69¢ per kWh of metered usage. ,plus a Basic Service Charge of $10:52 per month and the <br />applicable.additional charges as specifted�on;Sheet:Nos,. 6.02.0 and 6.021.. <br />Continued to Sheet No.:6 826 <br />ISSUED BY: :N;: G. Tower;; President DATE EFFECTIVE: 0,. <br />Monthiy <br />Monthly <br />Rate <br />Facility: <br />Maintenance <br />Code: <br />Desai tion <br />- - -= <br />Ghar'e <br />Char e <br />563 <br />Timer <br />57.54 <br />$1.43 <br />:569 <br />PT Bracket accommodates two post top fixtures <br />$4.2.7 <br />$0.06 <br />J.NON-STANDARD FACILITIES AND SERVICES: <br />The customer shall pay all costs associated with additional company facilities and services that are <br />not oonsldered standard for Providing lighting service including <br />but not limited to, the following: <br />1. relays; <br />2, distribution transformers installed solely for lighting service; <br />3. protectiveshields; <br />4. bird deterrent devices; <br />a light trespass shields; <br />6, light rotations; <br />7. light pole relocations; <br />8. devices required by local regulations to control the levels or duration of illumination including <br />associated planning and engineering costs; <br />9.. removal and replacement of pavement required to install underground lighting cable; and <br />10. directional boring. <br />MINIMUM CHARGE: The monthly charge. <br />FUEL CHARGE: See Sheet Nos, 6.020 and 6.021, <br />ENERGY CONSERVATION CHARGE: See Sheet Nos. 6:020 and 6.021: <br />CAPACITY CHARGE: See Sheet Nos. 6.020 and 6;021 <br />ENVIRONMENTAL COST RECOVERY CHARGE: See Sheet Nos. 6.020 and 6.021 <br />FLORIDA GROSS RECEIPTS TAX: See Sheet No. 6.021 <br />FRANCHISE FEE: See Sheet No. 6.021 <br />PAYMENT OF BILLS See Sheet No. 6.022 <br />............... ..................... <br />SPECIAL CONDITIONS: <br />On.customer-owned public street and highway lighting systems not subject to other rate schedules, the <br />monthly rate for energy serv2d at primaryar.eiecandar,y voltage, at, the company's option shall be <br />2.54pa69¢ per kWh of metered usage. ,plus a Basic Service Charge of $10:52 per month and the <br />applicable.additional charges as specifted�on;Sheet:Nos,. 6.02.0 and 6.021.. <br />Continued to Sheet No.:6 826 <br />ISSUED BY: :N;: G. Tower;; President DATE EFFECTIVE: 0,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.