Laserfiche WebLink
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI,, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 117 <br />Aftk TECO. <br />Ao'TAMPA ELECTRIC <br />AN EM,ERA COMPANY <br />SCHEDULE: SBFT <br />Attachment D <br />THIRTEENTH REVISED SHEET NO. 6.605 <br />CANCELS TWELFTH REVISED SHEET NO. 6.605 <br />TIME -OF -DAY <br />FIRM STANDBY AND SUPPLEMENTAL SERVICE <br />(OPTIONAL) <br />AVAILABLE: Entire service area. <br />APPLICABLE: Required for all self -generating Customers whose generating capacity in <br />kilowatts (exclusive of emergency .generation equipment) exceeds 20% of their site load in <br />kilowatts and who take firm service from the utility. Also available to self -generating''. <br />Customers whose generating capacity in kilowatts does not exceed 20% of their site load in <br />kilowatts, but who :agree to all the terms and conditions of this rate schedule; Resale not <br />permitted. <br />CHARACTER OF SERVICE: A -C; 60 cycles; 3 phase; at any standard..company voltage, <br />LIMITATION OF SERVICE: A'Customer taking serviceunder this tariff :must sign a Tariff'. <br />Agreement for the Purchase of Firm Standby and Supplemental Service. (See Sheet No. <br />7:600) <br />I MONTHLY RATE: <br />Basic Service Charac <br />Secondary Metering Voltage $ 55.18 <br />Primary Metering Voltage $ 155:51 <br />Subtransmission Metering Voltage $1,018.36 <br />CHARGES FOR STANDBY SERVICE: <br />Demand :Charge: <br />$ 1.68 per kW -Month of Standby Demand <br />(Local Facilities Reservation Charge) <br />plus the greater of: <br />$ 1.55 per kW -Month of Standby Demand <br />(Power Supply Reservation Charge) or <br />$ 0.62 per kW -Day of Actual Standby Billing Demand <br />(Power Supply Demand Charge) <br />Energy Charge: <br />0.917¢ per Standby kWh <br />Continued to Sheet No. 6.606 <br />ISSUED BY:, N. G. Tower, President <br />DATE EFFECTIVE: <br />