My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/15/2020
CBCC
>
Meetings
>
2020's
>
2020
>
09/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 2:22:38 PM
Creation date
11/9/2020 11:49:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/15/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 119 <br />A TECO <br />.A�" 1`AMPA ELECTRIC <br />AN EMERA COMPANY <br />Attachment D <br />THIRTEENTH REVISEDSHEET NO. 6.700 <br />CANCELS TWELFTH REVISED SHEET NO. 6.700 <br />INTERRUPTIBLE STAN DBYAND SUPPLEMENTALSERVICE: <br />(CLOSED TO NEW BUSINESS AS OF MAY 7, 2.009) <br />SCHEDULE: SBI <br />AVAILABLE: Entire service area. <br />APPLICABLE: Required for all self -generating customers eligible for service under rate <br />schedules :IS or ':IST whose generating capacity in kilowatts (exclusive of emergency <br />generation equipment) exceeds 20% of their site load in kilowatts. Also available to self - <br />generating customers eligible for service under rate schedules IS or IST whose generating <br />capacity in ,kilowatts does not exceed 20% of their site load in'kilowatts but who agree to .611 <br />the terms and conditions of this rate schedule. To be eligible for service under this rate <br />schedule, a customer must have been taking interruptible service under rate schedules 'IS -1, <br />ISTAIS-3, IST -3, SBIA, or SBI -3 on May 6, 2009 and have signed the Supplemental Tariff <br />Agreement for the Purchase of Industrial Standby and Supplemental Load Management Rider <br />Service. Resale not permitted. <br />CHARACTER OF SERVICE: The .electric energy supplied under this schedule is three phase <br />primary voltage or.higher <br />LIMITATION OF SERVICE: A customer taking service under this tariff must sign the Tariff <br />Agreement for the Purchase of Standby and Supplemental Service <br />MONTHLY RATE: <br />Basic Service -Charge: <br />Primary Metering Voltage $649.14 <br />Subtransmission Metering Voltage $2,404.93 <br />Demand Charge: <br />$3:90 per KW -Month of Supplemental Demand (Supplemental Demand Charge) <br />$1:39 per KV1 Wonth of Standby Demand. (Local Facilities Reservation Charge) <br />plus the greater of: <br />$1.20 per KW -Month of Standby Demand (Power Supply Reservation <br />Charge); or <br />$0:48 per KW -Day of Actual Standby Billing Demand (Power Supply <br />Demand Charge) <br />Continued to .Sheet No. 6.705 <br />ISSUED BY: N. G. Tower, President <br />DATE EFFECTIVE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.