My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/15/2020
CBCC
>
Meetings
>
2020's
>
2020
>
09/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 2:22:38 PM
Creation date
11/9/2020 11:49:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/15/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0293 -AS -EI <br />DOCKET NOS. 20200067 -EI, 20200069 -EI, <br />20200070-EI,20200071-EI,20200092-EI <br />PAGE 66 <br />Attachment C <br />amount of $16,435;191 projected to be incurred in 2020,.then reduced by $10;400,000 to recognize. <br />those SPP costs in 2020 that are being transferred from base rites to the SPPCRC as agreed upon <br />in Tampa Electric's 2020 Settlement Agreement; the recovery of :costs in. the amount of <br />$3.3,908,399. projected to be':i icurred ;i t 202% a reduction of $511;861 to recognize diose .cost. <br />associated with Tampa Elec r]Ws Open Access°1"ransnrission Tariff;:and an:adjustment.'of $28;391. <br />to include the associated Revenue Tax Factor and that those costs are reasonable subject to a <br />prudence review of actual costs in the apphcalile SPPCI2C proceeding. Iid <br />n u m don,'Tampa.Electn <br />as part of the 2020 Settlement Agreement will reduce the retail ;portion of the $15 million in <br />revenue requirements to recognize those ongoing SPP costs:transferred from base rates to the <br />SPPCRC <br />22: The Parties agree that the appropriate SPPCRC factors for Tampa Electric for tlie. <br />period.January 2021. through December 2021 as presented below are reasonable, have evidentiary <br />support in the record and should be approved, subject to true -up in a future SPPCRC proceeding <br />Rate Schedule <br />RS <br />GS and CS <br />GSD Optional -Secondary <br />GSD.'Optional-Primary <br />GSD Optional—Sitbtratist.nission <br />LS -1, IS -2 <br />Rate Schedule: <br />GSD -secondary <br />GSD -Primary <br />GSD-Subtransmission <br />SBF -Secondary <br />SBF -Primary <br />9 <br />Cost Recovery Factors (cents .tier kWh) <br />0.239 <br />0.25.1 <br />0;168 <br />0.166. <br />0.16:4 <br />0.354 <br />Cost Recovery f=actors (dollars ner,kM7) <br />0,72 <br />0.71 <br />0:71. <br />0.72 <br />071 <br />
The URL can be used to link to this page
Your browser does not support the video tag.