My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/15/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/15/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2021 9:44:40 AM
Creation date
11/12/2020 1:54:31 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
07/15/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Packs/defibrillators, four (4) replacement power stretchers for a total of $80,000, and $111,000 for th� <br />replacement of three (3) hydraulic extraction tools. Budgeted vehicles/fire apparatus include tw <br />replacement fire pumpers - $1,200,000, a replacement ambulance - $375,000, and 4 replacement staff <br />vehicles - $140,000. <br />Construction of Fire Station 15 is included in the proposed budget for $1,050,000. The remaining <br />$1,350,000 in construction costs will be provided from Fire Rescue Impact Fees. Staff anticipates an <br />additional med unit will be necessary after Station 15 is constructed, which will also require additional <br />staffing. <br />Solid Waste Disposal District (SWDD) <br />NOTE: The Solid Waste Disposal District and Enterprise budgets are presented in accordance with Generally <br />Accepted Accounting Principles (GAAP). As a result, depreciation is included as a budgeted expense, while capital <br />outlay and debt service principal payments are excluded. <br />The total proposed SWDD budget is $17,826,067, which is an increase of $1,572,220 or 9.7% (page 41). <br />Proposed residential assessment rates are increasing by $3.47 or 2.9% to $124.37 per Equivalent <br />Residential Unit. Commercial rates are increasing by $2.29 or 5.5% to $44.29 per Waste Generation Unit <br />(W.G.U). The proposed readiness -to -use fee is $27.42 per W.G.U, an increase of $2.73 from last fiscal <br />year. • <br />Over the past year, the Board has made decisions to improve the way yard waste and leachate are <br />processed at the landfill. Although these changes have an overall positive impact on our environment, <br />they have contributed to increases in next year's budget. A new leachate pre-treatment system is <br />proposed in FY 2020/21 for $600,000. This system will reduce the nutrient loading from the <br />Landfill leachate which currently exceeds the Industrial Pre -Treatment Standards. This will help with <br />regulatory compliance at the West Regional Wastewater Treatment Facility and assist with the overall <br />impact to the lagoon. An additional $480,000 is programmed into the proposed budget as a result <br />of the newly approved vegetative waste processing contract awarded to Atlas Organics which began <br />in January of 2020. Atlas Organics processes the vegetative waste into compost, which is an <br />improvement over the former process of land applying the waste as mulch. <br />There are no inflationary adjustments proposed in landfill operation, recycling collection, or yard waste <br />processing contracts. Republic Services has requested a CPI increase of 2.25°/x, howeverthis increase, <br />which carries an additional cost of approximately $100,000 has not been supported by staff or <br />programmed into the budget. The County's contract with Republic Services has a CPI adjustment <br />effective January of each year while Waste Management and Atlas Organics' contract's CPI is adjusted in <br />April. Although the CPI was positive in January, staff is of the opinion that Republic Services should <br />forego the requested increase due to the impact COVID-19 has had on the economy and local taxpayers. <br />Waste Management and Atlas Organics have proposed no change from their current rates, however staff <br />is continuing negotiations to decrease rates by 0.44% which is reflective of the negative CPI adjustment <br />for April. <br />F_ -I <br />LJ <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.